论文部分内容阅读
由碧口水电厂、甘肃电力试验研究所、全国水机磨蚀试验研究中心合作完成的碧口水电厂~#3机(HL702—LJ—410,H_p=73m,N_T=103MW)转轮叶片测绘整形于1992年10月10日~11日通过了由甘肃省科委委托甘肃电力局主持的鉴定。
The Bikou hydropower plant ~ # 3 (HL702-LJ-410, H_p = 73m, N_T = 103MW) completed by the Bikou hydropower plant, Gansu Electric Power Experimental Research Institute and the National Water Abrasion Test and Research Center In October 10 to 11 adopted by the Gansu Provincial Commission of Science and Technology commissioned by the Gansu Electric Power Bureau identified.