论文部分内容阅读
一九八五年四月十五日到五月二十五日,我们先后参加学习了北京、西安、成都、昆明、广州、南昌、上海、沈阳等地通信楼的载波机房布局,结合我局的具体情况,经研究后决定采用活动地板地下走线方法。电源汇流条也在活动地板下,用木槽、垫木绝缘固定方法。载波机、列头柜、试验架、试验台等为了防震用活动地板和机座架连体固定方法。为防水暖跄水和鼠啃电缆,机房内四周加水泥台作活动地板面支承架方法解决。实践证明上述方法是可行的,效果也佳,各种技术指标均达到部标要求;同时机房内给人一种明快、大方、敞亮、新颖的感觉。通信楼载波机房建成后,受到各方面的一致好评。
From April 15 to May 25, 1985, we successively attended the layout of the carrier room in communication buildings in Beijing, Xi’an, Chengdu, Kunming, Guangzhou, Nanchang, Shanghai and Shenyang, The specific circumstances, after the study decided to use the activities floor underground alignment method. Power bus also under the active floor, with wooden trough, wood insulation fixed method. Carrier machine, the first column cabinets, test stand, test stand, etc. for the earthquake with the activities of the floor and the machine frame Siamese fixed method. For warm water and mouse gnaws water cable, the engine room around the cement floor for the activities of the floor surface support method. Practice has proved that the above method is feasible, the effect is good, a variety of technical indicators have reached the standard requirements; the same time give a bright, generous, spacious, novel feeling. After the communication floor carrier room was built, by all aspects of the praise.