2014年12月16日,南水北调中线工程焦作段正式建成通水,标志着“引来长江水,滋润新焦作”的蓝图已变为现实。工程建成通水后,年调水量可达95亿立方米,其中分配给焦作市2.82亿立方米,相当于焦作市水资源总量的三分之一,每年可为焦作市区供水2.25亿立方米。工程在焦作市设置了5个分水门,建成5条输水管线(总长45.23千米),分别向温县、武陟县、焦作新区、焦作市区、修武县供水。总干渠城区段总长16.7千
On December 16, 2014, the Jiaozuo section of the mid-route of the South-to-North Water Diversion Project was formally opened to water, marking a blueprint for “bringing in the Yangtze River water and moisturizing the new focus”, which has become a reality. After completion of the project, the annual water diversion volume will reach 9.5 billion cubic meters, of which 282 million cubic meters will be allocated to Jiaozuo City, equivalent to one-third of the total water resources of Jiaozuo City, 225 million cubic meters of water will be supplied annually to Jiaozuo City Meter. The project set up 5 water diversion gates in Jiaozuo City and built 5 water transmission lines (total length 45.23 km) to provide water supply to Wen County, Wudai County, Jiaozuo New District, Jiaozuo City and Xiuwu County respectively. The total length of the main canal city section 16.7 thousand