论文部分内容阅读
在发展国民经济的第一个五年计划中曾经指出地质工作在第一个五年计划期间的任务之一是:‘加强水力资源和综合流域开发的地质勘测工作,保证第一个五年计划期间重要水利工程和水力发电所需的地质资料,并为第二个五年计划所需的水力资源作好准备工作’。从这里可以体会到水力发电建设与水力资源普查有着密切关系,同时这也说明了水力资源普查的重要意义。
In the first five-year plan for the development of the national economy, it was pointed out that one of the tasks of the geological work during the first five-year plan was: ’Strengthen hydropower resources and comprehensive geological exploration of basin development to ensure the first five-year plan. The geological data required for the important water conservancy projects and hydroelectric power generation, and prepare for the necessary hydraulic resources for the second five-year plan’. From here, we can understand that hydroelectric power generation has a close relationship with the general survey of hydraulic resources, and at the same time it also shows the significance of the general survey of hydraulic resources.