论文部分内容阅读
水泥煅烧过程中生料和煤粉流量具有较大的时滞,所以它们是难以控制的。本文介绍一种间歇积分控制方案,其可行性已经在实际应用中得到证实。
The raw material and pulverized coal flow have a large time lag during the calcination of cement, so they are difficult to control. This article describes an intermittent integral control scheme, the feasibility has been confirmed in practical applications.