一个生产性的基本建设项目,从立项到开工,究竟要经过多少个关卡,盖多少个图章,有的人统计要100多个章子。据我所知,在三千万元以下的省批项目就要经过以下主要的关卡: 1、立项:上报项目建议书,经主管局、县市计经委、省主管厅局审批同意后,报省计经委批准后,下达设计任务书。 2、可行性报告阶段,由设计部门负责编制可行性报告,必须征求当地环保、规划、消防、土管、交通、物资、供水、供电、防疫、通讯等部门意见,要求气象、水利部门提供水文气象资料,报告完后要由各
For a productive infrastructure project, from the start of the project to the start of construction, exactly how many levels will be passed and how many stamps will be covered, and some people will need more than 100 chapters. As far as I know, the provinces approved for projects under 30 million yuan will pass through the following major checkpoints: 1. Project establishment: The project proposal will be reported. After approval by the Bureau, the county- and city-level economic planning commission, and the provincial competent authority, the report will be submitted. After the approval of the Provincial Planning Commission, the design task book was issued. 2. In the feasibility report stage, the design department is responsible for the preparation of the feasibility report. It must solicit local opinions on the departments of environmental protection, planning, fire control, soil management, transportation, materials, water supply, power supply, epidemic prevention, and communication, and request the meteorological and water resources departments to provide hydrological and meteorological services. Data, each report should be followed by