论文部分内容阅读
华能岳阳电厂安装的英国 GEC 公司生产的362MW 机组,在具体结构上有许多自己的特点,这些特点不同程度上引起了施工的变化。其中对安装工艺影响最大,技术难点较高,首推汽轮发电机组的基础埋件施工。
The 362MW unit produced by UK GEC installed by Huaneng Yueyang Power Plant has many specific features in terms of specific structures. These characteristics have caused changes in construction to varying degrees. Among them, the greatest impact is on the installation process, and the technical difficulty is higher. The basic embedded construction of the turbo-generator set is the first choice.