论文部分内容阅读
城市工程管线承担着城市的物质流输送和信息流传输等工作,是一座城市赖以生存和发展的物质基础。目前,我国城市建设发展迅速,由于部分市政管线未能和道路施工同步进行,且各种管线经常出现损坏和扩容等情况,导致道路二次开挖现象比较严重。另外,由于各市政管线在平面和竖向布置上的不合理,也经常影响各专业管线的设计、施工进度,造成大量的人力物力浪费。城市工程管线综合详细规划阶段的主要工作目的,就是为了合理安排各工程管线在城市的地上和地下空间位置,协
Urban engineering pipeline undertakes the city’s material flow and information flow transmission and other work, is a city’s material basis for the survival and development. At present, the rapid development of urban construction in our country has led to serious secondary excavation of roads as a result of the failure of some municipal pipelines to be carried out simultaneously with road construction and the frequent damage and expansion of various pipelines. In addition, due to the unreasonable layout of the municipal pipelines in the plane and the vertical, the design and construction progress of the specialized pipelines are often affected, resulting in a lot of manpower and material resources being wasted. The main purpose of the comprehensive detailed planning phase of urban engineering pipeline is to reasonably arrange the location of the aboveground and underground space of each pipeline in the city.