大唐信阳发电有限责任公司(以下简称公司)成立于1995年,总装机容量为192万千瓦。2006年以来,大唐信阳发电公司在持续做好两台30万千瓦机组深度挖潜的基础上,充分利用国家大力调整电力结构,加快“上大压小”政策的历史机遇,顺利建设投产了大唐集团公司和河南省第一个两台66万千瓦高参数、大容量机组工程。几年来,公司创新机制,深入挖潜,多项经济技术指标从集团末位一举跻身集团同类型机组的先进行列,一期机组煤耗连续两年下降19.6克/千瓦时。3号机组工程从开工至通过168小时试运工期仅为18个月,创下了60万千瓦等级机组国内一流水平,两台机组脱硫工程实现了与主机同步投运。二期工程造价最终控制在3151元/千瓦时,比同期建设的机组每千瓦节省造价数百元,处于全国同类型机组先进水平,工程在大唐集团率先实现了“即投产、即稳定、即盈利、即达设计值、即结算”的目标,同时开创了投产一个月完成竣工决算的全国先例。
Datang Xinyang Power Generation Co., Ltd. (hereinafter referred to as the Company) was founded in 1995 with a total installed capacity of 1.19 million kilowatts. Since 2006, Datang Xinyang Power Generation Company has made full use of the depth of tapping potential of two 300,000-kilowatt generating units and made full use of the historic opportunity of the government to adjust its power structure vigorously and speed up the policy of “increasing large units and small units”, and successfully put into operation Datang Corporation and Henan Province, the first two 660,000 kilowatts of high-parameter, high-capacity unit project. Over the past few years, the company innovative mechanism, digging deeper potential, a number of economic and technical indicators from the bottom of the group in one fell swoop among the group of the same type of advanced unit, a unit of coal consumption fell 19.6 g / kWh for two consecutive years. Unit 3 project from start to 168 hours through the trial period of only 18 months, setting a 600,000 kilowatt level unit of the domestic first-class level, the two unit desulfurization project to achieve synchronization with the host put into operation. The final control of the second phase of the project cost 3151 yuan / kWh, compared with the same period the construction of the unit cost savings of several hundred dollars per kilowatt, in the country with the advanced level of the same type of unit, the project took the lead in Datang Group to achieve “that is, That is, profitability, that is, up to the design value, that is, settlement. ”At the same time, it created a national precedent of one month’s completion of final accounts.