论文部分内容阅读
《武汉市城市快速轨道交通建设规划(2009-2020)》日前通过了评估。主城区4条轨道过江通道将承担45%的过江出行量。
“Wuhan City Rapid Rail Transit Construction Plan (2009-2020)” recently passed the assessment. The main urban area 4 track corridor will take 45% of the river trips.