管道工程全生命周期划分为规划、前期、初设、实施以及验收5个阶段,各个阶段互联互通,其产生的数据信息十分庞大,数据关系也错综复杂,建立一套完整的管道工程数据管理平台十分重要。该平台运用计算机技术搭建管道工程数据库逻辑模型,主要包括数据采集、数据处理、数据审核、进度汇总、质量管理、报表分析、系统管理7个功能模块。通过对各阶段数据的采集、储存、计算、统计及分析,将管道工程全生命周期各阶段数据有效整合、衔接及递延,保证了管道工程各业务信息数据的规范性、系统性及科学性,同时可为管道运行管理提供真实、准确的数据支持服务。
The whole life cycle of pipeline engineering is divided into five stages: planning, pre-construction, initial implementation, and acceptance. The interconnection and interworking of all stages leads to a huge amount of data and information and complex data relationships. Therefore, a complete set of pipeline engineering data management platform important. The platform uses computer technology to build the logical model of pipeline engineering database, including seven functional modules of data acquisition, data processing, data review, progress summary, quality management, report analysis and system management. Through the data collection, storage, calculation, statistics and analysis of all stages, the data of all stages of the pipeline project’s life cycle are effectively integrated, connected and deferred, thus ensuring the normative, systematic and scientific information of each business pipeline project At the same time, it can provide real and accurate data support service for pipeline operation and management.