一、工程概况 1.工程目的本工程地处香山公园内,系配属香山饭店的工程。位于饭店正门及旁门前的排洪沟上。两座桥均为市政设计院设计的石拱桥。 2.工程规模设计载重:汽—15级,人群350公斤/平方米。 1~#桥为6米跨拱桥,矢跨比1/3,车行道宽4.9米,全宽6.1米,桥长10.8米,沥青混凝土桥面。 2~#桥为7米跨拱桥,矢跨比1/2,车行道宽5.844米,人行道宽1.528米,,全宽9.76米,桥长13.547米。
First, the general situation of the project 1. The purpose of the project The project is located in Xiangshan Park, the Department of Xiangshan hotel accessories project. Located in front of the hotel and next to the flood discharge ditch. Both bridges are designed by the municipal design institute stone arch bridge. 2. The size of the project design load: steam -15 level, the crowd of 350 kg / square meter. 1 ~ # bridge is 6 meters across the arch bridge, sag more than 1/3, 4.9 meters wide roadway, full-width 6.1 meters, 10.8 meters long bridge, asphalt concrete bridge. 2 ~ # Bridge 7 meters across the arch bridge, sag more than 1/2, width of 5.844 meters roadway, 1.528 meters wide sidewalk, full width 9.76 meters, 13.547 meters long bridge.