效率系数法在孤石滩水库电站流量计算中的应用

来源 :河南水利 | 被引量 : 0次 | 上传用户:haoxuexi0825
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1问题的提出位于颖河水系澧河上游的孤石滩水库水文站,控制流域面积286km~2,目前有泄洪闸、输水道、电站3个出流断面,自该水库水电站运行发电以来,输水道断面基本上常年不出流,泄洪闸除汛期防汛需要开启泄洪外,平时主要是电站发电出流。电站的运行在给水管单位创造效益的同时,也给水文职工带来了测验工作上的新问题。 1 PROBLEM PROBLEM The Bishitan Reservoir Hydrology Station, located in the upper reaches of the Yinghe River, has a controlled drainage area of ​​286km ~ 2. There are currently 3 outflow sections of flood gates, waterways and power stations. Since the operation of the reservoir hydropower station, power has been lost Sewer sections are basically perennial not out of flow, flood control flood season need to open the flood control, usually the main power station outflow. The operation of the power station to create benefits for water supply units, but also to the hydrological workers has brought new problems on the test.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
30 5小汽轮机组振动原因主要有 2个 :制造工艺没有保证轴系的平衡 ;轴承设计没有考虑小转子体轻和非接触式测振的特点 ,而采用对轴颈约束强制轴承结构。因此 ,使转子相对振动
本文对国内外应用于赤泥沉降分离中的絮凝剂的研制和应用现状及前景进行了详细的叙述 This paper describes the current situation and prospects of the development and
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
泡沫混凝土是一种新型建筑隔热保温材料,在国家出台了一些列节能减排的措施及规定下,泡沫混凝土中气孔的引入赋予其普通混凝土所没有密度小、质量轻,而且还具有较好的保温、隔音
我们在以前的河道护坡中多采用石块砌筑,对生态的保护、水体的自净、微生物的生长、地下水的沟通在相当程度上起到了负面影响的作用。如何保护自然环境的已有的生物链?如何提
1溢洪道施工方案陆浑水库溢洪道工程位于拦河坝东部,距大坝东坝头约500m,溢洪道泄洪闸为3孔闸,呈“U”型结构,单孔净宽12m,闸墩长度27m(规范要求一般不超过20m,比规范要求超
1概况黑河金盆水利枢纽是西安市工业和居民生活用水的主要水源工程,溢洪洞位于大坝右岸,为特大高速无压隧洞,由进口引渠段、溢流闸室段、陡坡段、反弧段、平流段和出口挑流鼻
1施工方案由于大坝基础混凝土体积大,混凝土浇筑必须分块分仓进行,混凝土浇筑仓位的划分一定要和原材料供应能力、拌和能力、运输能力、平仓能力、振捣能力相适应,不然,就会
简要介绍了日本WOODWARD公司生产的DEH数字电液调节系统的构成、工作原理和主要功能,及其在25MW双抽机组上的应用.