论文部分内容阅读
湖北要进一步发展,必须电力先行,从湖北能源资源的实际出发,煤炭自给率很低,而开发水电潜力很大,水电资源中清江约占开发容量的60%。梯级开发清江,可获得增强全省经济发展后劲,有利于电网的安全稳定运行、促进山区经济的发展和提高清江与长江荆江大堤的防洪标准等综合效益。目前隔河岩工程进展顺利,可以达到1993年第一台机组发电的目标。隔河岩工程建设取得较好成绩的主要经验有:动员全省人民支援工程建设、实行招标承包、实行科学管理、征地移民由地方政府包干、大胆采用新技术、利用外资,引进设备等。目前梯级开发清江流域的条件已经具备,时机已成熟。
In order to further develop Hubei, Hubei must first go ahead with electricity. From the reality of energy resources in Hubei, coal self-sufficiency rate is very low, and there is great potential for hydropower development. Hydropower resources in Qingjiang account for about 60% of development capacity. Qingjiang cascade development can be obtained to enhance the province’s economic development potential, is conducive to the safe and stable operation of the power grid, and promote economic development in mountainous areas and improve the Qingjiang River and the Yangtze River flood control standards and other comprehensive benefits. At present, Geheyan project progressed smoothly, which can reach the goal of generating electricity for the first unit in 1993. Geheyan project construction has made good achievements in the main experience: to mobilize the people of the province to support the construction, the implementation of the tender contract, the implementation of scientific management, land acquisition and resettlement by the local government contractors, bold use of new technologies, the use of foreign investment, the introduction of equipment. At present, the conditions for the development of the Qingjiang River cascade are already available and the time is ripe.