中小型建筑结构计算入门 第十八讲 钢筋混凝土双向板计算例题

来源 :建筑知识 | 被引量 : 0次 | 上传用户:tanjuan1980
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
例题根据下列已知条件,试设计一钢筋混凝土双向板。双向板呈矩形,三边与梁现浇成整体,梁宽25 cm。一边自由支承(悬空)。长边长度=5.75 m,短边长度=5 m。板顶抹水泥砂浆2 cm厚,板底抹灰2 cm厚。板上活荷重p=300kg·m~2。见图1。解:一、板的计算简图。[双向板三边与梁现浇成整体,为了应用表1现成表格计算,可假定这三边是板的固定端,只要梁有足够的刚度(比板的刚度大得多), Example A reinforced concrete two-way slab was designed based on the following known conditions. The two-way board has a rectangular shape, and the three sides are cast in one piece with the beam. The beam width is 25 cm. Freely supported (floating). Long side length = 5.75 m, short side length = 5 m. The top of the slab is 2 cm thick and the bottom is 2 cm thick. The active load on the board is p=300kg·m~2. see picture 1. Solution: First, the calculation of the board diagram. [The three sides of the two-way slab are integrated with the cast-in-place beam. To use the existing table calculations in Table 1, it can be assumed that the three sides are fixed ends of the slab as long as the beam has sufficient rigidity (larger than the stiffness of the slab).
其他文献
【走进作者】汪涵,湖南卫视节目主持人。他从场工做起,慢慢涉足灯光、音控、摄影、现场导演等,通过自己的努力一步一步地从“抬桌子”成为“台柱子”。他主持过历届“超女”
十年树木,百年树人。在大兴安岭茫茫林海中,孙秀文——内蒙古牙克石林业第一中学校长,30年来如一日,用她的满腔热忱,在林区教育事业这片沃土上播撒了汗水、智慧与爱。 Ten y
1.引言我国城市集中供热事业通过30多年来的建设,已初具规模。三北地区已有54个城市有了城市集中供热设施,供热面积达8000万平方米,城市供热在工农业生产和人民生活中发挥了
《语文课程标准》要求习作“要能不拘形式地写下自己的见闻、感受和想象”,到高年级时“能写简单的记实作文和想象作文”。在“教学建议”中指出:“要让学生展开想象和幻想,鼓励
当前,人类社会正步入一个全新的技术发展时期,以个人电脑、网络技术和多媒体为主要内容的现代信息技术的出现,为教学活动提供了新的发展空间,改革了传统的教学模式和方法,从整体上
工业工程师(Industrial Engineer)作为一种职称,出现于19世纪末。至今,他已是工程师家族中的重要成员之一。 从广义角度讲,工业工程(Induatrial Engineering,简称IE)是一种
本文引入了非负权重组合预测冗余方法的概念,提出了几个删除冗余方法的定理.这几个冗余定理能简化非负权重最优组合预测问题,并用几个实例表明了这些冗余定理的有效性. In this
本文介绍一个平面为正六边形的网格梁板屋盖。它首次采用部分预应力砼三向网格梁结构。文中简述了设计中遇到的问题及解决办法,并扼要列出模拟试验及工程实测中的结果。 Thi
本刊讯(记者孙海燕)由日本聚氨酯工业株式会社(NPU)主办、北京建筑节能专业委员会协办的阻燃型PU技术交流会4月19日在京举行。建设部“聚氨酯硬泡建筑节能应用推广工作组”副
教材是“金科玉律”,是“范本”,是“载体”,是“例子”,是“材料”……不同的角度,受不同教育思想、教育观念的影响,对教材的认识、理解就全然不同。对教材的使用则更有天壤之别,传