摘要:在建筑市场竞争激烈的新时期下,提高施工质量管理水平是每一位企业管理者所应该思考的问题。影响施工质量的因素是多方面的,竣工测量是建筑物竣工后所进行的一项城市规划实施管理阶段的工作,其质量控制对于建筑物竣工验收有着很好的作用,本文主要分析建筑物竣工測量过程中质量控制的内容,并提出一些控制中的注意点。
关键词:建筑工程;竣工测量;质量控制
中图分类号:TU198文献标识码: A
Abstract:In construction market competitive in the new period, improve the level of construction quality management is every enterprise managers should think about the problem. Are many factors affecting the quality of construction, completion of measurement is building after the completion of an urban planning implementation management phase of the work, the quality control for building the completion acceptance had a very good effect, this article mainly analyzes the buildings completed in the process of measuring the content of the quality control, and puts forward some control of the point.
Keywords: Construction project; Completion of measurement; The quality control
中图分类号: TU198.2 文献标识码:A
测量工作不仅影响一个工程能否顺利按图施工,而且还给施工质量提供重要的技术保证,为质量检查等工作提供方法。竣工测量成果的质量,不仅关系到测绘部门是否掌握现状地理信息的正确性,而且涉及到规划管理部门对规划的审批监督管理。所以,竣工测量成果的质量是关系到城市建设管理和规划落实的一项重要测绘工作,在建筑物竣工测量中要求工作人员非常谨慎、细致,数据处理科学合理,从而保证建筑物的测量质量。
一、建筑工程竣工测量质量控制的主要内容
建筑工程竣工测量是一项服务于城市规划建设的实用性测绘工作,不仅要按照《城市测量规范》要求来采集常规内容,还要采集规划部门所需的信息和内容,以此来保证实测竣工项目的现状地形图的完整、有效、合理、直观。竣工测量质量控制的主要内容主要包括:
1测量精度质量控制
为了使竣工测量图与拨地测量图可以进行同精度的比较,精度要求不低于拨地测量的控制精度。《城市测量规范》规定:拨地测量要按照三级导线的技术要求进行,在控制布设困难的条件下,可以同级附合一次,来布设三级补导线。相对于起算点的最弱点点位中误差不得大于5cm,竣工测量的平面控制精度按上述技术要求执行。,测量单位根据实验统计数据规定采用这种方式布设支导线,数量要在5条边以下,长度要小于400m,并且相邻控制点间要作坐标检查,检查的平面坐标误差小于2cm。也可以使用GPS RTK定位技术进行多次观测代替三级导线。
2图根点的质量控制
图根点是直接供测图使用的依据,可以采用光电测距导线和GPS测量等方法测定。其中需要注意的是:城市建成区由于道路的改扩建,沿干线道路布设的一、二级导线点常常容易被破坏,因此在这个区域要及时增补布设高一级导线点;建筑密集区,导线布设的形状往往不理想,导线中常有短边,以此要在测角时应使用三脚架加觇板作为定向标志;用全站仪施测时定向边长应大于放样边长,必须注意控制支导线总长和边数,保证最弱点点位精度;内业计算前,对各项观测记录数据要逐项检查、核对。
3碎部测量质量控制
碎部测量涉及测量竣工范围内的各种设施、建筑物外轮廓、建筑物附属设施以及竣工项目范围外、规划控制要素相关的建筑和设施等。碎部测量通常用全站仪极坐标法结合钢卷尺量测的方法进行。需要注意的是测站仪器要严密对中点位,数据采集边长要小于定向边长的1.5倍;观测筑物凸角顶位置时,可通过全站仪的角度偏心观测,测量凹角顶点位置时,可采用距离偏心观测;用免棱镜仪器测量时,被测地物距测站点不能距离太远;外业数据采集时,应将靠近竣工项目范围的建筑物及与规划要素有关的地物数据一并采集编辑。
4项目规划要素测量质量控制
规划要素测量是建筑工程竣工测量的重点之一,它是,对竣工项目规划要素进行实地测量,主要包括以下几个:(1)边长测量质量控制。边长测量包括建筑物周边长度,建筑物周边关系和建筑物间距测量等,所有边长测量均采用钢卷尺直接测量,无法进行时,才可用间接法或全站仪对边测量的方法进行施测。(2)立面高度测量。场地高程测量采用附合图根水准测量方法对建筑物的室内室外地坪高程进行实测。同一建筑物室内地坪有高差的应分别测量,同时应量测地下室及地下车库,人防工程的净高。建筑物立面高度和建筑物标准层高测量可采用直接法全站仪对边测量或光电测距三角高程的方法施测。(3)竣工项目总平面图。竣工项目总平面图是在实测地形图上进行的,总平面图上除表示常规地形要素外,还应标示规划管理部门需要的各类城市规划控制线的准确位置,注明规划许可证所附总平面图上所示尺寸位置的实际测量数据和审批数据,并绘制相应的图例,必要时还需对一些特别情况作文字性备注说明。(5)工程测量测绘成果表。建筑工程测量测绘成果表中包含各建筑物房角坐标的实测数据以及坐标位置的备注说明每幢房的房角坐标选取应取该建筑物的较长边。
二、竣工测量应注意的问题
1统一坐标系
建筑工程从征地、设计到建设完成,先后经过多个部门的多次测量工作,因为时间原因,各部门采取的坐标系统会存在差异,而竣工测量要求将前期成果综合,所以,在工程建设过程中,应该统一坐标系。
2成果应用
城市地形图通常选择定期更新的方法,竣工测量内容与地形图修补有很大的相关性,可以通过竣工测量成果进行地形图更新。竣工测量和地形修补测的用途及技术标准不同,因为一套成果无法满足两者要求,如果竣工测量成果用于地形图更新,就应该在竣工测量技术设计书中涵盖地形图更新的技术要求,外业数据采集尽可能完整、系统,内业成图要同时考虑两者要求,以满足不同用途的需要。
三、结束语
总而言之,在竣工测量中必须强调的在实工程中要严把测量质量关,严格的按照我国建筑物建设管理相关规定执行,做好建筑物竣工测量过程中的数据处理及质量控制工作。为了更好的保证测量的质量,还需要我们更多的付出努力改进,更需要在实际工作中尽职尽责,完成任务。
参考文献:
[1]叶孙春.建筑物竣工测量过程中的数据处理及质量控制[J]. 民营科技.2011
[2] 许南鸿.城市建筑竣工测量质量控制技术探讨[J].科技资讯.2010
[3] 唐春云.扬州市建设工程规划竣工测绘探讨[J].北京测绘.2012
关键词:建筑工程;竣工测量;质量控制
中图分类号:TU198文献标识码: A
Abstract:In construction market competitive in the new period, improve the level of construction quality management is every enterprise managers should think about the problem. Are many factors affecting the quality of construction, completion of measurement is building after the completion of an urban planning implementation management phase of the work, the quality control for building the completion acceptance had a very good effect, this article mainly analyzes the buildings completed in the process of measuring the content of the quality control, and puts forward some control of the point.
Keywords: Construction project; Completion of measurement; The quality control
中图分类号: TU198.2 文献标识码:A
测量工作不仅影响一个工程能否顺利按图施工,而且还给施工质量提供重要的技术保证,为质量检查等工作提供方法。竣工测量成果的质量,不仅关系到测绘部门是否掌握现状地理信息的正确性,而且涉及到规划管理部门对规划的审批监督管理。所以,竣工测量成果的质量是关系到城市建设管理和规划落实的一项重要测绘工作,在建筑物竣工测量中要求工作人员非常谨慎、细致,数据处理科学合理,从而保证建筑物的测量质量。
一、建筑工程竣工测量质量控制的主要内容
建筑工程竣工测量是一项服务于城市规划建设的实用性测绘工作,不仅要按照《城市测量规范》要求来采集常规内容,还要采集规划部门所需的信息和内容,以此来保证实测竣工项目的现状地形图的完整、有效、合理、直观。竣工测量质量控制的主要内容主要包括:
1测量精度质量控制
为了使竣工测量图与拨地测量图可以进行同精度的比较,精度要求不低于拨地测量的控制精度。《城市测量规范》规定:拨地测量要按照三级导线的技术要求进行,在控制布设困难的条件下,可以同级附合一次,来布设三级补导线。相对于起算点的最弱点点位中误差不得大于5cm,竣工测量的平面控制精度按上述技术要求执行。,测量单位根据实验统计数据规定采用这种方式布设支导线,数量要在5条边以下,长度要小于400m,并且相邻控制点间要作坐标检查,检查的平面坐标误差小于2cm。也可以使用GPS RTK定位技术进行多次观测代替三级导线。
2图根点的质量控制
图根点是直接供测图使用的依据,可以采用光电测距导线和GPS测量等方法测定。其中需要注意的是:城市建成区由于道路的改扩建,沿干线道路布设的一、二级导线点常常容易被破坏,因此在这个区域要及时增补布设高一级导线点;建筑密集区,导线布设的形状往往不理想,导线中常有短边,以此要在测角时应使用三脚架加觇板作为定向标志;用全站仪施测时定向边长应大于放样边长,必须注意控制支导线总长和边数,保证最弱点点位精度;内业计算前,对各项观测记录数据要逐项检查、核对。
3碎部测量质量控制
碎部测量涉及测量竣工范围内的各种设施、建筑物外轮廓、建筑物附属设施以及竣工项目范围外、规划控制要素相关的建筑和设施等。碎部测量通常用全站仪极坐标法结合钢卷尺量测的方法进行。需要注意的是测站仪器要严密对中点位,数据采集边长要小于定向边长的1.5倍;观测筑物凸角顶位置时,可通过全站仪的角度偏心观测,测量凹角顶点位置时,可采用距离偏心观测;用免棱镜仪器测量时,被测地物距测站点不能距离太远;外业数据采集时,应将靠近竣工项目范围的建筑物及与规划要素有关的地物数据一并采集编辑。
4项目规划要素测量质量控制
规划要素测量是建筑工程竣工测量的重点之一,它是,对竣工项目规划要素进行实地测量,主要包括以下几个:(1)边长测量质量控制。边长测量包括建筑物周边长度,建筑物周边关系和建筑物间距测量等,所有边长测量均采用钢卷尺直接测量,无法进行时,才可用间接法或全站仪对边测量的方法进行施测。(2)立面高度测量。场地高程测量采用附合图根水准测量方法对建筑物的室内室外地坪高程进行实测。同一建筑物室内地坪有高差的应分别测量,同时应量测地下室及地下车库,人防工程的净高。建筑物立面高度和建筑物标准层高测量可采用直接法全站仪对边测量或光电测距三角高程的方法施测。(3)竣工项目总平面图。竣工项目总平面图是在实测地形图上进行的,总平面图上除表示常规地形要素外,还应标示规划管理部门需要的各类城市规划控制线的准确位置,注明规划许可证所附总平面图上所示尺寸位置的实际测量数据和审批数据,并绘制相应的图例,必要时还需对一些特别情况作文字性备注说明。(5)工程测量测绘成果表。建筑工程测量测绘成果表中包含各建筑物房角坐标的实测数据以及坐标位置的备注说明每幢房的房角坐标选取应取该建筑物的较长边。
二、竣工测量应注意的问题
1统一坐标系
建筑工程从征地、设计到建设完成,先后经过多个部门的多次测量工作,因为时间原因,各部门采取的坐标系统会存在差异,而竣工测量要求将前期成果综合,所以,在工程建设过程中,应该统一坐标系。
2成果应用
城市地形图通常选择定期更新的方法,竣工测量内容与地形图修补有很大的相关性,可以通过竣工测量成果进行地形图更新。竣工测量和地形修补测的用途及技术标准不同,因为一套成果无法满足两者要求,如果竣工测量成果用于地形图更新,就应该在竣工测量技术设计书中涵盖地形图更新的技术要求,外业数据采集尽可能完整、系统,内业成图要同时考虑两者要求,以满足不同用途的需要。
三、结束语
总而言之,在竣工测量中必须强调的在实工程中要严把测量质量关,严格的按照我国建筑物建设管理相关规定执行,做好建筑物竣工测量过程中的数据处理及质量控制工作。为了更好的保证测量的质量,还需要我们更多的付出努力改进,更需要在实际工作中尽职尽责,完成任务。