据《钢铁炉料市场》报导 ,河南栾川洛阳钼业公司 30 0 0t/d选矿厂于去年底投产。该技术改造工程始于 1 997年中旬 ,属国家第二批“双加”项目之一 ,也是河南省“九五”期间重点技改工程。该选厂改造总投产 7754万元 ,总建筑面积 1 .0 9万m2 ,总装机容量 4 2 0 0kW ,共安装
According to the “Steel Charging Market”, a 300t / d ore dressing plant at Luoyang Molybdenum Co., Ltd., Luanchuan, Henan, was put into operation late last year. The technical renovation project started in mid-1997, belonging to one of the second batch of “double plus” projects of the country and also a key technical renovation project during the Ninth Five-year Plan of Henan Province. The dressing plant transformation of a total production of 77.54 million yuan, with a total construction area of 1.90 million m2, with a total installed capacity of 4200kW, a total of installation