青山水轮泵站位于湖南省临澧县城以北37公里澧水干流上,站址以上集雨而积15242公里~2。该站于1966年动工兴建,1972年主体工程基本完成并部分受益。整个工程分枢纽和灌区两大部分。枢纽工程由主坝、副坝、泵站、电站、船闸、引水闸等建筑物组成,主坝和副坝均为浆砌石重力坝。主坝长369米,阳大坝高9~14米,泵房长187米,宽18.5米,高12.9米,内装AT100-8型水轮泵35台,总流量为15.28米~3/秒。通过7根直径1.1 Qingshan Water Pump Station is located 37 kilometers north of Linqu County in Hunan Province. The rainwater is collected above 15,242 km2. The station started construction in 1966, the main project in 1972 basically completed and partially benefit. The whole project sub-hub and irrigation two major parts. The hub project consists of the main dam, auxiliary dam, pumping station, power station, ship lock, diversion gate and other structures. The main dam and auxiliary dam are masonry gravity dam. The main dam is 369 meters long and the Yang Dam is 9 to 14 meters high. The pump house is 187 meters long, 18.5 meters wide and 12.9 meters high. There are 35 AT100-8 turbine pumps installed, with a total flow of 15.28 m 3 / s. Through seven diameter 1.1
其他文献
一、概况渔子溪二级水电站为一高水头引水式电站,设计水头257.5米,最大净水头301.8米,安装4台HL-100-LJ210型水轮机,水流相对于水轮机叶片的速度大于30米/秒。减少高速挟沙
引言本文通过所收集到的资料,对金山海岸的演变进行分析,略述金山海岸的演变过程,已由冲刷型转变为冲淤交替型。为了稳定金山岸线,1975年起陆续把原有的丁坝增建单向或双向
进行水库建设将带来大量的迁移,尤其是大中型工程移民工作量更大,如山美水库移民多达两万三千多人,山区五百万立米以上的小(一)库也要移民一二百人以上,能否妥善处理移民问
本文论述在没有厂家试验资料的情况下,通过分析冲击式水轮机的工作过程,直接确定机组主要参数,并指出应根据电站的不同运行方式确定直径比。 This paper discusses the main
一、保护装置的现状我县低压水轮发电机组,均采用HFS型控制屏保护。控制屏保护部分的接线见图YJ——过电压继电器;SJ——时间继电器;CJ——水电阻接触器;1XJ,2XI——信号继
格莱斯(Grace)所提出的“合作原则”是语用学中一个重要的理论。其主要内容为:为了保持沟通及交流的顺畅,人们会遵循一定的原则及准则,以达到一定的交流目的。但在某种特定的
前言闸坝下游渗流出逸处,最易发生渗透破坏,诸如流土、管涌等,有时在设置反滤层后,也常常会淤堵,最后仍将导致失事。造成渗透变形的原因是渗流出逸坡降大于该处土料的临界坡
彝文译文文献长诗是彝文传统文学文献的主要内容,是将其他民族优秀的包括民间传说在内的传统文学作品翻译再创作后,融入本民族的文学系统中,作为本民族精神食粮的有机组成部
水文站实测流量资料一般都不长,难以满足水电站、特别是水电站群设计和运行管理的需要。本文用随机过程的理论与方法模拟径流过程的统计特性,建立有效的数学模型,并以黄河上
在汉语国际教育大力推广的背景下,国家越来越重视对外汉语教师的培养。《对外汉语教学法》是汉语国际教育本科专业的必修课及主干课程,该课程一直以理论传授为主导,学生对课