论文部分内容阅读
本文从电视播控新机房播控与总控系统功能设计、新机房交流供电系统设计、新机房播控与总控系统集成施工、播控与总控系统搬迁进度安排、播控与总控系统传输链路技术指标测试等方面,对我局2004年实施完成的电视播控与总控系统搬迁工程,进行了较详细的总结与介绍。
This article from the television broadcast control of the new engine room and master control system design, the new engine room AC power supply system design, the new engine room broadcast control and master control system integration construction, broadcast control and master control system relocation schedule, broadcast control and master control system Transmission link technical indicators test and other aspects of the implementation of the Bureau in 2004, the TV broadcast control and total control system relocation project, conducted a more detailed summary and introduction.