印度自从1947年独立以来,对发展电力进行了广泛的研究,并且在国家发展计划中确定了大中型工程建设项目。印度1947年发电装机容量共136.2万kW,其中:水电50.8万kW,火电85.4万kW;1982~1983年装机容量共3,533.9万kW,其中:水电1,304.1万kW,火电2,143.8万kW,核电86.0万kW.在1985~1986年开始的第7个五年计划期间,计划增加装机容
Since its independence in 1947, India has conducted extensive research on the development of electricity and has established large and medium-sized engineering construction projects in its national development plan. India’s installed power generation capacity in 1947 totaled 1.362 million kW, of which: hydropower 508,000 kW, thermal power 854,000 kW; installed capacity from 1982 to 1983 totaled 35.339 million kW, of which: hydropower was 30.441 million kW, thermal power was 21.43 million kW, and nuclear power was 860,000 kW During the 7th Five-Year Plan from 1985 to 1986, plans to increase the installed capacity