论文部分内容阅读
介绍了2002年武钢炼铁厂配矿结构优化探索工作,炉料结构对炉况有重大影响,找出在现有资源条件下的最佳配矿结构,实现改善技术经济指标和降成本的目标。
This paper introduces the optimization and exploration work of the ore-bearing structure of WISCO iron-smelting plant in 2002. The structure of the charge material has a significant impact on the furnace condition, and the best mine structure under the existing resource conditions is found out, so as to achieve the goal of improving the technical and economic indexes and lowering the cost.