论文部分内容阅读
我国中小型水电站目前普遍存在投运年限长、技术落后、设备老化等问题,电站综合自动化技术改造成为解决问题的关键环节。本文针对长顺水电站综合自动化系统改造施工项目存在的安全管理问题,系统地提出了问题解决的建议,如加强对施工队伍的资质审查及安全教育、加强施工前的安全布置、对施工队伍进行质量培训、重视施工现场安全交底等,以期使长顺电站技改的施工能达到安全、高效的效果,且能够为我国中小型电站的综合自动化改造施工提供有益的借鉴或启示。
At present, the problems of long service life, backward technology and equipment aging are widespread in small and medium-sized hydropower stations in our country. The transformation of integrated automation technology in power plants has become the key link in solving the problem. According to the safety management problems existing in the construction project of the comprehensive automation system of Changshun Hydropower Station, this paper puts forward some suggestions to solve the problems systematically, such as strengthening qualification examination and safety education for construction team, strengthening the safety arrangement before construction, Training, pay attention to the safety of the construction site and so on, in order to make the construction of Changshun Hydropower Station technical transformation can achieve safe and efficient results, and can provide a useful reference for our small and medium-sized power station comprehensive automation transformation construction.