公路路基施工放样与控制的可视化系统,是通过便携机与全站仪的实时通讯而建立的一体化软件系统,实现对高等级公路路基施工过程中有关的图形表现与绘制,任意点的坐标放样及任意时刻的施工进度与控制。目的是减少人工干预的中间环节,提高野外数据采集的自动化程度,提高现场设计能力和施工信息的反馈速度,缩短工序,减少浪费,促进工程施工信息管理的系统化。
The visualization system of highway subgrade construction setting-out and control is an integrated software system established by the real-time communication between the portable machine and the total station to realize the graphical representation and drawing related to the subgrade construction process of high grade highway and the coordinate loft of any point And any time the construction progress and control. The purpose is to reduce the intermediate links of manual intervention, improve the automation of field data collection, improve the speed of field design capability and construction information feedback, shorten the process, reduce waste and promote systematic construction information management.