论文部分内容阅读
【摘 要】通过经年的水土保持方案编制,越来越认识到项目概况对于水土保持方案报告的重要性,只有对项目概况了解透彻,分析得当,才能结合项目区情况及主体设计工程分析情况,因地制宜布设符合工程特点的工程措施。
【关键词】热电联产扩建工程;项目概况;编写内容;水土保持
Cogeneration expansion project profiles prepared by the contents of the preliminary study should be noted
Zhang Lei
(Xinjiang Water Resources and Hydropower Survey and Design Institute Urumqi Xinjiang 830000)
【Abstract】After years of soil and water conservation through programming, project profiles for increasing awareness of the importance of soil and water conservation program reports, only a thorough understanding of project profiles, analysis appropriate to the situation with the project area and the main design engineering analysis of the situation, according to local conditions laid line with Engineering characteristics of the engineering measures.
【Key words】Cogeneration expansion project;Project Overview;Written content;Soil and Water Conservation
1. 引言
随着水土保持作为生产建设项目立项审批和核准的主要条件之一 ,水土保持方案的审批改变了过去凡是上报都一路绿灯放行、报一个批一个的模式,水土保持方案的审查也越来越细致,项目概况的描述也要求透彻、详细。本文以热电联产扩建工程为例,对热电联产扩建类项目概况编写内容应注意的方面进行了总结,期望能为其他编写同类工程方案报告的同行提供些许经验。
2. 重视前期工程描述,为前期工程与本期工程依托关系打好基础
2.1 编制方案为扩建类项目的,工程分析过程中不能遗漏前期工程概况,并且要进行详细分析。
在进行本期工程分析前,首先应进行前期工程概况的分析,包括前期工程的总体情况及前期工程防护设施现状两部分内容。
前期工程的总体情况包括:布置方式、占地面积、水源、排水、贮灰场、运灰道路、煤源运输方式、进场道路等情况外,不能遗漏(1)是否修建脱硫设施,(2)出线方位及走廊,(3)电厂生活福利区布设情况。
前期工程防护设施现状包括:排水情况,硬化、绿化工程,临时防护措施等。由于工程特殊性,需要交代的应考虑周全详细描述,不可缺项漏项。
2.2 要重视前期工程水土保持开展情况分析。
水保[ 2007]184号文规定“同一投资主体所属的开发建设项目,在建及生产运行的工程中存在未编报水土保持方案、水土保持方案未落实和水土保持设施未按期验收的水土保持方案不予批准”。因此同一投资主体所属的开发建设项目项目概况中不可漏缺前期工程水土保持工作开展情况,是否进行了水土保持方案编制,编制时间,批复时间及批复机关,水土保持方案中水土流失防治重点是什么,水土保持方案是否实施,分区论述水土保持措施实施的效果如何,水土保持监理单位,是否开展水土保持监测,是否进行了水土保持验收。
3. 前期工程与新建工程依托关系分析
建议该部分以表格形式为主,避免与前期工程描述重复,并且一目了然,增强可读性。以一热电联产扩建工程为例。拟建工程是在前期的扩建端基础上进行建设,其与前的公用工程情况见表1。
4. 新建工程分析应注意的方面
4.1 厂区。
厂区总平面布置:由于是在原厂址上的扩建,因此除了交代清楚新建工程布置情况,重点还要交代清楚占用老厂新建、改建扩建部分情况;此外热电联产项目还要考虑供热管网是否包含在本方案中。
厂区竖向布置:是影响到厂区土石方挖填方量的重要环节,不应遗漏或简化。
4.2 贮灰场。
因本工程为新建贮灰场,因此除常规描述外,应关注(1)论证是否满足堆灰渣的要求,(2)如果有防渗要求,防渗用的砂料来源,不能漏项,(3)贮灰场运行方式,灰渣洒水水源、水量,灰渣是否与石膏分别堆放。
4.3 施工道路。
要分别论述进场道路、运灰道路、施工过程中利用已有道路情况、是否新修道路及施工道路布设的合理性。
目前大部分临时施工道路为砂砾石(或碎石)路面道路,主要不能遗漏砂砾石(或碎石)来源,这些都是有可能影响工程土石方平衡及措施的部分。
4.4 电厂水源。
要分生活用水及生产用水两部分进行论述。生活用水部分要论述清楚是否利用前期工程生活供水管网,是否需对前期工程生活供水管网进行改扩建。生产用水供水的方式不能遗漏中水或地表水取水许可;取水可靠性分析;工程需水量中不能遗漏生活用水部分。
4.5 供水管线。
论述过程中应注意供水管线征地面积是否符合水保要求,有些主体设计中只考虑管线开挖宽度,不考虑管材堆放区域,机械作业带,管沟开挖土临时堆放区,堆土两侧临时挡护区面积。因此项目概况编制的过程中应把握以上问题,做到心中有数,在水土保持方案的相关章节进行补充和完善。
5. 结语
水土保持方案中的项目概况,应该是整部报告的基础,编制人员一定只有基础打好,才能做到因地制宜合理布设防治措施,避免设计产品中出现重大的措施不合理或漏项等问题的发生。
[文章编号]1006-7619(2011)04-11-339
[作者简介] 张蕾(1977.2-),女,籍贯:河北,工作单位:新疆水利水电勘测设计研究院环评所,研究方向:水土保持、环境影响评价。
【关键词】热电联产扩建工程;项目概况;编写内容;水土保持
Cogeneration expansion project profiles prepared by the contents of the preliminary study should be noted
Zhang Lei
(Xinjiang Water Resources and Hydropower Survey and Design Institute Urumqi Xinjiang 830000)
【Abstract】After years of soil and water conservation through programming, project profiles for increasing awareness of the importance of soil and water conservation program reports, only a thorough understanding of project profiles, analysis appropriate to the situation with the project area and the main design engineering analysis of the situation, according to local conditions laid line with Engineering characteristics of the engineering measures.
【Key words】Cogeneration expansion project;Project Overview;Written content;Soil and Water Conservation
1. 引言
随着水土保持作为生产建设项目立项审批和核准的主要条件之一 ,水土保持方案的审批改变了过去凡是上报都一路绿灯放行、报一个批一个的模式,水土保持方案的审查也越来越细致,项目概况的描述也要求透彻、详细。本文以热电联产扩建工程为例,对热电联产扩建类项目概况编写内容应注意的方面进行了总结,期望能为其他编写同类工程方案报告的同行提供些许经验。
2. 重视前期工程描述,为前期工程与本期工程依托关系打好基础
2.1 编制方案为扩建类项目的,工程分析过程中不能遗漏前期工程概况,并且要进行详细分析。
在进行本期工程分析前,首先应进行前期工程概况的分析,包括前期工程的总体情况及前期工程防护设施现状两部分内容。
前期工程的总体情况包括:布置方式、占地面积、水源、排水、贮灰场、运灰道路、煤源运输方式、进场道路等情况外,不能遗漏(1)是否修建脱硫设施,(2)出线方位及走廊,(3)电厂生活福利区布设情况。
前期工程防护设施现状包括:排水情况,硬化、绿化工程,临时防护措施等。由于工程特殊性,需要交代的应考虑周全详细描述,不可缺项漏项。
2.2 要重视前期工程水土保持开展情况分析。
水保[ 2007]184号文规定“同一投资主体所属的开发建设项目,在建及生产运行的工程中存在未编报水土保持方案、水土保持方案未落实和水土保持设施未按期验收的水土保持方案不予批准”。因此同一投资主体所属的开发建设项目项目概况中不可漏缺前期工程水土保持工作开展情况,是否进行了水土保持方案编制,编制时间,批复时间及批复机关,水土保持方案中水土流失防治重点是什么,水土保持方案是否实施,分区论述水土保持措施实施的效果如何,水土保持监理单位,是否开展水土保持监测,是否进行了水土保持验收。
3. 前期工程与新建工程依托关系分析
建议该部分以表格形式为主,避免与前期工程描述重复,并且一目了然,增强可读性。以一热电联产扩建工程为例。拟建工程是在前期的扩建端基础上进行建设,其与前的公用工程情况见表1。
4. 新建工程分析应注意的方面
4.1 厂区。
厂区总平面布置:由于是在原厂址上的扩建,因此除了交代清楚新建工程布置情况,重点还要交代清楚占用老厂新建、改建扩建部分情况;此外热电联产项目还要考虑供热管网是否包含在本方案中。
厂区竖向布置:是影响到厂区土石方挖填方量的重要环节,不应遗漏或简化。
4.2 贮灰场。
因本工程为新建贮灰场,因此除常规描述外,应关注(1)论证是否满足堆灰渣的要求,(2)如果有防渗要求,防渗用的砂料来源,不能漏项,(3)贮灰场运行方式,灰渣洒水水源、水量,灰渣是否与石膏分别堆放。
4.3 施工道路。
要分别论述进场道路、运灰道路、施工过程中利用已有道路情况、是否新修道路及施工道路布设的合理性。
目前大部分临时施工道路为砂砾石(或碎石)路面道路,主要不能遗漏砂砾石(或碎石)来源,这些都是有可能影响工程土石方平衡及措施的部分。
4.4 电厂水源。
要分生活用水及生产用水两部分进行论述。生活用水部分要论述清楚是否利用前期工程生活供水管网,是否需对前期工程生活供水管网进行改扩建。生产用水供水的方式不能遗漏中水或地表水取水许可;取水可靠性分析;工程需水量中不能遗漏生活用水部分。
4.5 供水管线。
论述过程中应注意供水管线征地面积是否符合水保要求,有些主体设计中只考虑管线开挖宽度,不考虑管材堆放区域,机械作业带,管沟开挖土临时堆放区,堆土两侧临时挡护区面积。因此项目概况编制的过程中应把握以上问题,做到心中有数,在水土保持方案的相关章节进行补充和完善。
5. 结语
水土保持方案中的项目概况,应该是整部报告的基础,编制人员一定只有基础打好,才能做到因地制宜合理布设防治措施,避免设计产品中出现重大的措施不合理或漏项等问题的发生。
[文章编号]1006-7619(2011)04-11-339
[作者简介] 张蕾(1977.2-),女,籍贯:河北,工作单位:新疆水利水电勘测设计研究院环评所,研究方向:水土保持、环境影响评价。