论文部分内容阅读
边境铁路换装站在我国边境口岸站中占有较大比例,通过对中俄边境口岸站作业过程及作业时间的分析调查,结合我国准轨铁路车站设备规模核定方法,对边境口岸换装站各主要车场设备规模进行核定。
The border railway substation station occupies a large proportion in China’s border crossings. Through the analysis and investigation of the operation process and working time of the border crossings between China and Russia, combined with the verification of the equipment scale of the Chinese quasi-rail railway station, The size of the main yard equipment to be approved.