摘要:深基坑工程作为城市工程建设中的重要工程,对于城市的建设发展而言具有重要的意义。深基坑支护技术是一项较为系统的技术,做好深基坑支护的设计需要研究和了解各种问题。本文就从深基坑的相关技术出发,同时结合具体的案例进行相关的分析,从而为深入的研究了深基坑发展的相关问题,以供大家交流和参考。
关键词:深基坑;支护;技术分析
Abstract: As an important city of deep foundation pit engineering in project construction, is of great significance for the construction and development of the city. Supporting technology of deep foundation pit is asystematic technology, completes the design of deep foundation pit support need to study and understand the various problems. This article embarks from the related technology of deep foundation pit, and combined with the specific cases were analyzed, so as to study the related problems of deep foundation pit development, for everyone to communicate and reference.
Key words: deep foundation pit support; technical analysis;
中图分类号:TU74
一、深基坑工程的开挖
深基坑开挖施工前,施工单位应根据地质勘探的资料和水文气候情况,结合自身深基坑工程施工的经验和现场条件编制施工组织设计。施工组织设计的主要内容包括:基坑的支护、 基坑的开挖、施工平面布置图、降水措施、施工监测布置等。开挖要综合考虑开挖过程中基坑的受力特点,不能局部一次开挖到基底,使开挖区土体侧压力急剧释放,引起坑壁侧向位移。除此之外还要有专项施工方案和突发事件的应急预案。基坑的开挖施工是一个循序渐进的过程,应尽量做到一边施工一边监测,并遵循“分层开挖,先撑后挖,随挖随撑,对称均衡,限时限量”的施工原则,杜绝野蛮施工和盲目施工,并对施工过程加强控制,保证基坑支护安全顺利地完成。承担施工的单位要严格按照经过审批的施工组织设计及相关的施工规程和技术规范进行开挖,同时要加强施工过程中的监测。在土方开挖施工前要充分掌握工程所在地的地質勘测报告、周围建筑物和地下管线等设施的情况。对特殊土质更是要根据土质的不同进行施工组织设计,比如在膨胀土地区施工应避开雨季施工,在开挖过程中要充分关注膨胀土的特点,确保土体含水量的变化不大,从而使基坑支护尽可能受到土体膨胀压力的影响。在软土地区开挖时,分层深度不宜太大。这是因为如果挖土高差太大或挖土进度过快,就会打破土体原有的力学平衡,使其抗剪强度降低,使土体容易出现水平滑移,增大支护设施的额外压力,最终可能导致支护发生破坏而出现坑壁坍塌。
二、深基坑支护设计和施工现状
目前的建筑施工,其中的深基坑支护因其专业性较强,一般都分包给了岩土专业施工公司,比较大的公司一般是当地的勘察设计施工单位,另外,还有一些规模和实力较强的专业公司,当前市场上,个人岩土公司也有一些。从设计和施工资质上看:比较大的岩土专业施工公司既有施工资质又有设计资质;而一些小的岩土专业施工公司只有施工资质,而没有设计资质,这种情况在当前的岩土工程施工中为数较多。
最近两年,一些业主为了提前开工等多种因素,在招标时改变常规,对地下岩土工程部分在结构主体招标前先进行招标,随之而来出现了一些新现象:许多大的建筑总承包单位为了抢占市场,纷纷参与了投标,一些大的建筑总承包单位进入了岩土工程施工。然而,不论是业主还是监理单位,他们都忽视了建筑总承包单位一般都没有岩土工程设计资质的问题,这给将来的施工造成了很多隐患。从承包模式看:基坑支护施工一般都实行分包,有些是业主直接将基坑工程分包给了专业公司,然后纳入总承包单位管理;而另一种模式是业主将基坑任务交给了总承包单位,而由总承包单位进行分包。前一种模式因业主将任务直接分包,故在总包单位管理时易出现管理难的问题,而后一种模式容易出现工程质量问题。
从深基坑工程特点看:深基坑开挖深度大,很多深基坑紧邻其它建筑物(或构筑物),施工难度较大,除了合理设计外,必须加强施工管理,确保严格按设计和相关规范施工,必须对基坑边坡和周围建筑物(或构筑物)加强监测,实现信息化施工。
三、深基坑工程施工特点
基坑工程是基础和地下工程施工中和一个传统课题,也是一个综合性的岩土工程难题,既涉及土力学典型强度问题和变形问题,又涉及到土体与支护结构的相互作用问题。深基础施工是大型和高层建筑施工中极其重要的环节,而深基坑支护结构技术无疑是保证深基础顺利施工的关键。为了设置建筑物的地下室需要开挖深基坑,所以深基坑开挖只是深开挖的一种类型。深开挖还包括为了埋设各种地下设施而必须进行的深层开挖。
目前,我国深基坑工程施工有下述特点:
基坑深度不断增加。为了使用方便、节约土地,为了符合城市管理规定及人防需要等,建筑不断向地下发展。过去建1~2层地下室,在大城市也不普遍,中等城市则更为少见。现在大城市、沿海地区尤其是特区,地下3~4层已经很平常,5~6层也很多见。因此,基坑开挖深度多在10m~16m之间,深度在20m左右的也很多。
建筑工程地质条件越来越差,基坑周围环境复杂。在某些沿海经济开发区,建筑工程所处的地质条件差的问题较为突出。城市中,高层和超高层建筑集中在人口稠密、建筑物密集的地方,并紧靠重要市政公路。而一般情况下,这些地方的原有建筑结构陈旧,地上与地下管线密布。因此,基坑开挖不仅要保证基坑本身的稳定,也要保证周围的建筑物和构筑物不受破坏。基坑支护方法多。现在,深基坑支护的方法越来越多,如混凝土灌注桩、人工挖孔桩、预制桩、深层搅拌桩、钢板桩、地下连续墙、锚钉墙等,还有各种桩、板、墙、管、撑同锚杆联合支护。
四、施工中突发事件预防及应急措施
4.1 内容
常见的深基坑支护工程施工突发事件包括有:基坑内出现管涌、流沙等;基坑支护局部出现裂缝、沉降;工程所在地连续多日出现狂风暴雨;相邻工地降水、打桩、开挖土方对本工程的影响;开挖中出现地下障碍物妨碍基坑支护结构或止水帷幕等。在深基坑开挖施工中,要事先设立预案,发现有异常,即时拿出相应方案指导施工,并进行跟踪监测,验证方案是否有效, 确保基坑及周边环境的安全。当预计事件发生后, 应立即启动应急预案及时解决。
4.2 预防措施
在施工中一般做好以下预防措施。为确保止水质量,防止基坑开挖时漏水,止水桩施工前要对施工桩位及临近的障碍物进行逐一清除。为确保基坑不发生漏水和渗水现象,基坑开挖时,要做好桩间土的保护,如发现坑内漏水严重,要先在坑内封堵抢险,同时查明原因,进行整改。必要时可用高标号砂浆在桩间砌砖或在桩间进行挂网喷浆。为确保支护桩施工质量与桩周管线安全,在支护桩施工前,要查明下部管线并进行标注,开挖并架空处理靠近施工区的下部管线。为应对突发事件,现场要储备足够的钢管、水泥、木桩、草袋、水玻璃等物资和潜水泵、压浆机、注浆机等设备。一旦出现险情,马上采取措施控制其发展。为防止周围地下水降深过大,要事先做好灌槽和回灌井。
4.3 应急措施
尽管在施工中以预防为主,力争做到事前控制,但在施工中仍有可能会出现意外情况。因此,要做好相应的处理,确保施工顺利。当出现基坑漏水时,要针对现场情况在坑外采用压密注浆或深层搅拌来进行止水。当止水桩达一定强度后,才可逐步拆除坑内抢险封堵物。在拆除坑内抢险封堵物时,要密切观察原出水处情况。当支护桩出现位移量超过警报值时, 应立即停止开挖,分析原因并采取措施,当措施落实并生效后才能继续开挖。同时要加大基坑及其周边监测频率。当出现周边道路、管线沉降过大时,也应立即停止土方开挖,分析查找原因,并在沉降区及周边采用压密注浆加固土体,采用树根桩加固管道后才能继续施工。当出现道路和管道开裂时,应立即切断相应的气源、水源和电源,配合相关部门修复,并针对原因在开裂区加固土体后再继续施工。
五、结语
工程的建设和施工是一项复杂的过程,所以必须做好没一个环节,实现全面的监控和安全生产,在这方面我们在工程的建设过程中采用深基坑支护技术也是一样,必须对其的相关技术知识全面把握,对每一个细节严格要求。每一种施工工艺都是需要严格施工组织,需要科学合理的施工原理的指导,需要施工单位有效的施工安排,在深基坑支护施工中,相关技术部门需要综合各方的实际情况,一切从实际出发,与此同时不断结合自身的施工实际,对施工的相关技术进行广泛的探讨,最终选定有效的施工方案。最终把工程的建设做的更好,更有保障,而对基坑的技术发展而言,也能够在实际的工作中不断的完善和丰富。
关键词:深基坑;支护;技术分析
Abstract: As an important city of deep foundation pit engineering in project construction, is of great significance for the construction and development of the city. Supporting technology of deep foundation pit is asystematic technology, completes the design of deep foundation pit support need to study and understand the various problems. This article embarks from the related technology of deep foundation pit, and combined with the specific cases were analyzed, so as to study the related problems of deep foundation pit development, for everyone to communicate and reference.
Key words: deep foundation pit support; technical analysis;
中图分类号:TU74
一、深基坑工程的开挖
深基坑开挖施工前,施工单位应根据地质勘探的资料和水文气候情况,结合自身深基坑工程施工的经验和现场条件编制施工组织设计。施工组织设计的主要内容包括:基坑的支护、 基坑的开挖、施工平面布置图、降水措施、施工监测布置等。开挖要综合考虑开挖过程中基坑的受力特点,不能局部一次开挖到基底,使开挖区土体侧压力急剧释放,引起坑壁侧向位移。除此之外还要有专项施工方案和突发事件的应急预案。基坑的开挖施工是一个循序渐进的过程,应尽量做到一边施工一边监测,并遵循“分层开挖,先撑后挖,随挖随撑,对称均衡,限时限量”的施工原则,杜绝野蛮施工和盲目施工,并对施工过程加强控制,保证基坑支护安全顺利地完成。承担施工的单位要严格按照经过审批的施工组织设计及相关的施工规程和技术规范进行开挖,同时要加强施工过程中的监测。在土方开挖施工前要充分掌握工程所在地的地質勘测报告、周围建筑物和地下管线等设施的情况。对特殊土质更是要根据土质的不同进行施工组织设计,比如在膨胀土地区施工应避开雨季施工,在开挖过程中要充分关注膨胀土的特点,确保土体含水量的变化不大,从而使基坑支护尽可能受到土体膨胀压力的影响。在软土地区开挖时,分层深度不宜太大。这是因为如果挖土高差太大或挖土进度过快,就会打破土体原有的力学平衡,使其抗剪强度降低,使土体容易出现水平滑移,增大支护设施的额外压力,最终可能导致支护发生破坏而出现坑壁坍塌。
二、深基坑支护设计和施工现状
目前的建筑施工,其中的深基坑支护因其专业性较强,一般都分包给了岩土专业施工公司,比较大的公司一般是当地的勘察设计施工单位,另外,还有一些规模和实力较强的专业公司,当前市场上,个人岩土公司也有一些。从设计和施工资质上看:比较大的岩土专业施工公司既有施工资质又有设计资质;而一些小的岩土专业施工公司只有施工资质,而没有设计资质,这种情况在当前的岩土工程施工中为数较多。
最近两年,一些业主为了提前开工等多种因素,在招标时改变常规,对地下岩土工程部分在结构主体招标前先进行招标,随之而来出现了一些新现象:许多大的建筑总承包单位为了抢占市场,纷纷参与了投标,一些大的建筑总承包单位进入了岩土工程施工。然而,不论是业主还是监理单位,他们都忽视了建筑总承包单位一般都没有岩土工程设计资质的问题,这给将来的施工造成了很多隐患。从承包模式看:基坑支护施工一般都实行分包,有些是业主直接将基坑工程分包给了专业公司,然后纳入总承包单位管理;而另一种模式是业主将基坑任务交给了总承包单位,而由总承包单位进行分包。前一种模式因业主将任务直接分包,故在总包单位管理时易出现管理难的问题,而后一种模式容易出现工程质量问题。
从深基坑工程特点看:深基坑开挖深度大,很多深基坑紧邻其它建筑物(或构筑物),施工难度较大,除了合理设计外,必须加强施工管理,确保严格按设计和相关规范施工,必须对基坑边坡和周围建筑物(或构筑物)加强监测,实现信息化施工。
三、深基坑工程施工特点
基坑工程是基础和地下工程施工中和一个传统课题,也是一个综合性的岩土工程难题,既涉及土力学典型强度问题和变形问题,又涉及到土体与支护结构的相互作用问题。深基础施工是大型和高层建筑施工中极其重要的环节,而深基坑支护结构技术无疑是保证深基础顺利施工的关键。为了设置建筑物的地下室需要开挖深基坑,所以深基坑开挖只是深开挖的一种类型。深开挖还包括为了埋设各种地下设施而必须进行的深层开挖。
目前,我国深基坑工程施工有下述特点:
基坑深度不断增加。为了使用方便、节约土地,为了符合城市管理规定及人防需要等,建筑不断向地下发展。过去建1~2层地下室,在大城市也不普遍,中等城市则更为少见。现在大城市、沿海地区尤其是特区,地下3~4层已经很平常,5~6层也很多见。因此,基坑开挖深度多在10m~16m之间,深度在20m左右的也很多。
建筑工程地质条件越来越差,基坑周围环境复杂。在某些沿海经济开发区,建筑工程所处的地质条件差的问题较为突出。城市中,高层和超高层建筑集中在人口稠密、建筑物密集的地方,并紧靠重要市政公路。而一般情况下,这些地方的原有建筑结构陈旧,地上与地下管线密布。因此,基坑开挖不仅要保证基坑本身的稳定,也要保证周围的建筑物和构筑物不受破坏。基坑支护方法多。现在,深基坑支护的方法越来越多,如混凝土灌注桩、人工挖孔桩、预制桩、深层搅拌桩、钢板桩、地下连续墙、锚钉墙等,还有各种桩、板、墙、管、撑同锚杆联合支护。
四、施工中突发事件预防及应急措施
4.1 内容
常见的深基坑支护工程施工突发事件包括有:基坑内出现管涌、流沙等;基坑支护局部出现裂缝、沉降;工程所在地连续多日出现狂风暴雨;相邻工地降水、打桩、开挖土方对本工程的影响;开挖中出现地下障碍物妨碍基坑支护结构或止水帷幕等。在深基坑开挖施工中,要事先设立预案,发现有异常,即时拿出相应方案指导施工,并进行跟踪监测,验证方案是否有效, 确保基坑及周边环境的安全。当预计事件发生后, 应立即启动应急预案及时解决。
4.2 预防措施
在施工中一般做好以下预防措施。为确保止水质量,防止基坑开挖时漏水,止水桩施工前要对施工桩位及临近的障碍物进行逐一清除。为确保基坑不发生漏水和渗水现象,基坑开挖时,要做好桩间土的保护,如发现坑内漏水严重,要先在坑内封堵抢险,同时查明原因,进行整改。必要时可用高标号砂浆在桩间砌砖或在桩间进行挂网喷浆。为确保支护桩施工质量与桩周管线安全,在支护桩施工前,要查明下部管线并进行标注,开挖并架空处理靠近施工区的下部管线。为应对突发事件,现场要储备足够的钢管、水泥、木桩、草袋、水玻璃等物资和潜水泵、压浆机、注浆机等设备。一旦出现险情,马上采取措施控制其发展。为防止周围地下水降深过大,要事先做好灌槽和回灌井。
4.3 应急措施
尽管在施工中以预防为主,力争做到事前控制,但在施工中仍有可能会出现意外情况。因此,要做好相应的处理,确保施工顺利。当出现基坑漏水时,要针对现场情况在坑外采用压密注浆或深层搅拌来进行止水。当止水桩达一定强度后,才可逐步拆除坑内抢险封堵物。在拆除坑内抢险封堵物时,要密切观察原出水处情况。当支护桩出现位移量超过警报值时, 应立即停止开挖,分析原因并采取措施,当措施落实并生效后才能继续开挖。同时要加大基坑及其周边监测频率。当出现周边道路、管线沉降过大时,也应立即停止土方开挖,分析查找原因,并在沉降区及周边采用压密注浆加固土体,采用树根桩加固管道后才能继续施工。当出现道路和管道开裂时,应立即切断相应的气源、水源和电源,配合相关部门修复,并针对原因在开裂区加固土体后再继续施工。
五、结语
工程的建设和施工是一项复杂的过程,所以必须做好没一个环节,实现全面的监控和安全生产,在这方面我们在工程的建设过程中采用深基坑支护技术也是一样,必须对其的相关技术知识全面把握,对每一个细节严格要求。每一种施工工艺都是需要严格施工组织,需要科学合理的施工原理的指导,需要施工单位有效的施工安排,在深基坑支护施工中,相关技术部门需要综合各方的实际情况,一切从实际出发,与此同时不断结合自身的施工实际,对施工的相关技术进行广泛的探讨,最终选定有效的施工方案。最终把工程的建设做的更好,更有保障,而对基坑的技术发展而言,也能够在实际的工作中不断的完善和丰富。