论文部分内容阅读
黄河流域水土流失面积43万余平方公里,目前有了5万平方公里已经初步控制,预计9月底可达20余万平方公里,对根治黄河建设山区起了显著作用。会议认为黄河流域水土保持第二个五年规划的基本任务是“三年突击,两年扫尾,五年基本控制,提前实现或超过农业发展纲要,有效地改变黄河面貌”。 1959年是全国人民苦战三年有次定意义的一年,因而水土保持工作必须力争高速度的发展,以适应客观形势发展的需要。
With an area of 430,000 square kilometers of soil and water loss in the Yellow River Basin, there are currently 50,000 square kilometers of which have been initially controlled and are expected to reach more than 200,000 square kilometers by the end of September, playing a significant role in eradicating the construction of mountainous areas in the Yellow River. The meeting considered the basic task of the second Five-Year Plan for Soil and Water Conservation in the Yellow River Basin as follows: “Three-Year Assault, Two-Year Ending, Five Years Basic Control, Early Implementation or Exceeding Agricultural Development Program, Effectively Changing the Face of the Yellow River.” In 1959, there was a definite significance year for the people throughout the country in the three years of hard struggle. Therefore, water and soil conservation efforts must strive for a high-speed development to meet the needs of the development of the objective situation.