电力工业部刘澜波部长在水电工程和勘测设计局(处)长会议上的报告

来源 :水力发电 | 被引量 : 0次 | 上传用户:qczjhyt
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
自一九五三年以来,水电建设的发展是很快的。今后水电建设的任务更加繁重急迫,困难会很多。过去几年,水电在勘测、设计、建筑、安装方面做了不少工作,但这次各工程和勘测设计局(外)长会议,也检查出不少问题和缺点,必须采取有效措施加以解决。 水电建设原来由於五年计划未最后确定,工业发 Since 1953, the development of hydropower construction has been rapid. In the future, the task of hydropower construction will be more onerous and urgent, and there will be many difficulties. In the past few years, hydropower has done a lot of work in surveying, designing, construction, and installation. But this time, the Engineering and Surveying and Designing Bureau (external) meeting has also detected many problems and shortcomings, and must take effective measures to solve them. . Hydropower construction was originally unfinished due to the five-year plan, and industrial development
其他文献
一导言随着新中国经济建设事业的飞跃发展,焊接工作在机械契造修理和装配的过程当中,已经获得了更大限度的广泛应用。随着电焊条消费数量的增加,和对其质量要求的提高,已经
一最近曾读到了大连建新公司钢铁厂李振南同志的「粉末冶金碳化钨硬质合金刀的制造」论文,该文虽然着重在粉末冶金方面的操作纪录,然而也简明地叙述了该厂的生产经过。建新
回家的女儿  我仔细思索了一下我昨晚说的话,可有词不达意、欲盖弥彰的地方。  临近中午我是躺在床上接她从外地打来的电话的,她说,妈,你好点了没?我一会就到你那里。本来我像是缺水的、蔫了很久的,这回听了她的话,像是叶子马上立起来的苔菜,活回来了,嘴里却说,别回来呀,你千万别回来。心里却转动心思,赶紧到火车站去接她。  我想起我妈妈,除非她病到不能下床,否则她一定会和爸爸一起摇摇晃晃挣扎着到医院,再除
为布尔什维克党所鼓舞的全体苏联人民正在进行着伟大的共产主义建设工程。在伏尔加、德聂泊和阿姆河上修建庞大的水电站、拦河坝、船闸、运河和灌溉系统的工程使苏联各科学
(一) 施工的特点和方法梅山水库工程主要的是钢筋混凝土结构的连拱坝,在施工过程中允许一定的流量漫溢坝身,坝址附近河谷狭隘,两岸山坡陡峭,河床复盖层厚达12°公尺,采用隧
这篇文章是苏联在1986年第三次世界动力会议上所作的报告之一。虽然这篇文章的发表距今已近二十年,但它在今天对於我们来说,仍然具有很大的现实指导意义,因为从建造苏联第一
那一定是她青春里最冷的一个冬天,她的爱情成了一个美丽的泡沫,破灭在了寒冷的北京城里。作者有话说:写这篇文的初衷是想告诉女孩们,不要把巧合当作缘分,因为不是所有的巧合
由于电子计算机控制系统和程序控制系统在大规模水泥生产中的应用,使生产管理和设备管理之间的关系变得愈来愈密切,它们之间的相互促进和制约,成为左右生产形势的突出因素。
同志们:我报告的题目是:“新机器新生产的掌握问题”。由於新机器生产的准备工作,尤其是试造的准备工作,主要是由总工程师所领导的各科担任的,因此介绍准备工作的同时也需要
请下载后查看,本文暂不支持在线获取查看简介。 Please download and view, this article does not support online access to view profile.