论文部分内容阅读
文章主要介绍了国金电力工程充分贯彻基于网络化的控制方式和管理模式的设计理念,以达到减少控制点、减员增效的目的,也为类似工程提供了参考和借鉴。
This paper mainly introduces the design concept that Guojin Power Engineering fully implements the control mode and management mode based on network so as to reduce the control points and reduce staff efficiency. It also provides references for similar projects.