论文部分内容阅读
对北京市昌平区种植基地燃煤改地源热泵项目进行调研,分析了项目中7个种植基地的基本情况,地源热泵的基本情况以及项目建设的必要性。
The investigation of coal-fired ground-source heat pump project of planting base in Changping District of Beijing was carried out. The basic situation of 7 planting bases, the basic situation of ground-source heat pump and the necessity of project construction were analyzed.