论文部分内容阅读
(接上期)5.把其余相应的弦槌柄依次装到锤柄总档上,调整好相互轴架之间的间隙,再用直尺一组一组检查弦槌柄走向看是否倾斜,弦槌柄往哪儿偏就在对应的轴架同侧垫薄纸条,直到把所有都调整好后再装好剩余的联动器。6.把最低音琴键和次高音组两端的两个琴键的榔头用圈纸固定方法安装到弦槌柄正确的位置,装好键盘放入钢琴反复调整到原来击弦点位置,在弦槌柄上划上记号,用454瞬干胶固定好位置。再根据这个三个榔头做为基点,把其他榔头安装到位。所有榔头
(Connected to the previous period) 5. The rest of the corresponding hammer handle into the hammer handle followed by the total gear, adjust the mutual clearance between the shaft frame, and then a set of straightedge check hammer shank to see whether the tilt, chord Where are the hammer shanks on the same side of the corresponding shaft frame pad, until all have been adjusted before installing the rest of the linkage. 6. Install the hammer of the two keys at the two ends of the lowest pitches and the second highest pitches with the ring paper to the correct position of the hammer shank and put the keyboard into the piano to repeatedly adjust to the original strike point position. On the mark, with 454 cyanoacrylate fixed position. According to the three hammer as a starting point, the other hammer installed in place. All hammers