随着技术革命运动的开展,我院修改了1,500瓦小型电站的设计,最近又完成了8,000瓦人民公社电站的设计,这次设计的技术方向可以用一首歌来表达:由繁就精方便又安全土洋并举突破制造关综合利用要宝又发电切合实际人民心喜欢在我们的设计中充分考虑了我国的特点,采用因地制宜、因时制宜、因事制宜的方法。因地制宜主要是在设计中考虑就地取材的可能性,当地有什么材料就用什么材料。因时制宜指目前由于生产大跃进,设备制造及钢铁供应显得十分紧张,为了多生产主要的
With the development of the technological revolutionary movement, the Institute revised the design of a 1,500-watt small power station and recently completed the design of the 8,000-watt People’s Commune power station. The technical direction of this design can be expressed in a song: Safe and earth-to-peace and a breakthrough in manufacturing and comprehensive utilization of Yaobao and power generation to meet the needs of the people. We like to fully consider the characteristics of our country in our design, and adopt methods that suit local conditions, suit time, and adapt to circumstances. According to local conditions, the possibility of taking local materials into consideration in the design is important, and what materials are used in the local area are used. Timely means that due to the current leap forward in production, equipment manufacturing and steel supply are very tight, in order to produce more