十年来,经过不断探索、实践,创造了多种多样的监督方式,归纳起来主要有以下三种: 第一种模式,质监项目责任到人。这是开始阶段所采取的模式。即按照建设部所定指标,每个质监员承担3~5万m~2建筑面积的质监项目。由于人员配备不足,一般仅对建设单位办理“委托”的项目才承担监督。 第二种模式,分片监督。即质监站设立几个组(或科),每个组(科)负责一个片(区),实行巡回抽查的方式进行监督。每个项目并不明确责任人,监督组(或科)
In the past ten years, through continuous exploration and practice, a variety of supervision methods have been created, which can be summed up in the following three ways: The first model is the responsibility of quality control projects to people. This is the model adopted at the beginning stage. That is, according to the indicators set by the Ministry of Construction, each quality supervisor shall undertake a quality supervision project with a construction area of 3 to 50,000 m2. Due to lack of staffing, only the project that the construction unit handles “consignment” is generally responsible for supervision. The second model, fragmentation supervision. That is, the quality supervision station establishes several groups (or sections), and each group (section) is responsible for one film (area), and carries out supervision by way of random sampling. Each project is not clearly responsible, supervision group (or section)