论文部分内容阅读
针对黄土地区铁路客运专线路基工后沉降控制的特殊要求,探讨工后沉降控制的必要性、主要途径及其措施等,以确保工后沉降量控制在允许范围内。
Aiming at the special requirements of post-construction settlement control of railway passenger dedicated line in the loess area, the necessity of post-construction settlement control, the main ways and measures are discussed to ensure the post-construction settlement control within the allowable range.