论文部分内容阅读
1987年11月15日,西安市灯具厂(以下简称灯具厂)与福建省晋江县内坑陶瓷建材经营处(以下简称经营处)签订购销合同,约定经营处供应灯具厂墙瓷砖和马赛克等建筑材料,价值共计75094.1元.合同约定,货到验收后付款(5日内);质量不符样品,不收货不符款;误工期按3%罚款;按照实际破损补发货物.经营处于1988年1月和3月分两批发给灯具厂各种墙瓷砖和马赛克,价值共计71376,6元(实际价值76000多元).灯具厂在1988年1月14日收到经营处所发的第一批货后,没有按合同规定在5日内验收付款.2月7日,经营处派人到灯具厂进行商谈,灯具厂向经营处出据了欠款证明.3月15日,灯具厂收到经营处发运的第二批货后,仍然没有在合同规定的验收期内对货物质量提出异议.灯具厂在收到经营处两次
November 15, 1987, Xi'an Lighting Factory (hereinafter referred to as the lamp factory) and Jinjiang County, Fujian Province, ceramic materials within the Hang Building Materials Business Office (hereinafter referred to as the operation of the Department) signed a contract for the purchase and sale of lamps and lanterns factory wall tiles and mosaic construction Materials, a total value of 75094.1 yuan. Contract, the goods to the acceptance of payment (within 5 days); quality does not match the sample, not receiving non-conformities; Fake due to a fine of 3%; reissue the goods in accordance with the actual damage. Operating in January 1988 And in March, two batches of wall tiles and mosaics were sent to the lamp factory, worth a total of 71376, 6 yuan (actual value 76000 yuan.) Lamps factory in January 14, 1988 received the first batch of goods issued by the operation, Not according to the provisions of the contract within 5 days of acceptance payment February 7, the operation office sent to the lamp factory to discuss the lamps and lanterns factory to the business office issued a proof of arrears. March 15, the lamp factory received the operating agency shipped After the second shipment, there was still no objection to the quality of the goods within the acceptance period stipulated in the contract.