论文部分内容阅读
在雷继洲眼中,设备的每一个配件都是一件艺术品,都需要精心呵护。几年下来,他奉命转战了多个施工现场,可他负责的JQ900A型架桥机的电器、液压系统、配件等都完好如初,这和他的精心“照料”是密不可分的。2010年兰新高铁甘青段900吨箱梁运架施工是首次和局外公司合作的项目,代表着中国中铁六局的形象和管理水平。春节期间,雷继洲主动请缨,把回家过年的机会让给了其他工友,自己继续奋战在离家2000公里外的兰新工地。为了减少设备故障率,如期完成节点工期,这个坚强的汉子连续30天摸爬滚打在工地,每天总是第一个到达施工现场,
In the eyes of Lei Chau, every piece of equipment is a work of art, all need careful care. A few years later, he was ordered fought a number of construction sites, but he is responsible for JQ900A erecting machines, hydraulic systems, accessories, etc. are intact, and his meticulous “care ” is inseparable. In 2010, the construction of 900-ton box girder construction of Gansu-Qinghai section of Gansu-Qinghai Expressway is the first project to be co-operated with an outside company and represents the image and management level of China Railway 6th Bureau. During the Spring Festival, Lei Ji Chau volunteered to give the opportunity to go home the New Year to other workers, continue to fight their own home 2000 km away from the Lan new site. In order to reduce the failure rate of equipment, complete the schedule of the node as scheduled, this tough man fought for 30 consecutive days at the site, always the first day arrived at the construction site,