论文部分内容阅读
1.工程概况郑州市二道街亚龙小区5-7号楼建筑面积1460m~2,为7层带半地下室砖混结构,钢筋混凝土条形基础,局部联合基础,建筑高度(23.00+3.70)m;1~7层为住宅。该楼地基为黄河冲、淤积粉土,下部有七十年代开挖的防空洞,防空洞拱顶及侧壁为120mm厚砖墙,拱顶距现地面约4.5m。建房时对场地进行了物探,有防空洞的地方基坑挖到地面下约7.0m处,清除了基础范围以内的防空洞,用砖墙封堵了防空洞口,然后夯填灰土至基础底面。楼房建成后没有出现大的沉降,使用情况正常。 1998年7月12日郑州市降大雨,二道街和铭功路交叉口附近积水较深,后二道街街口发生了大面积塌方,大量雨水顺塌方处灌入下边的防空洞中,直接影响到南边约20m处5-7号楼的地基基础。7月16日早晨,市
1. Project Overview 5-7 Building, Yalong Sub-district, Erdaojie Street, Zhengzhou The building area is 1460m ~ 2, which is a 7-storey semi-basement brick-concrete structure with reinforced concrete strip foundation and partial joint foundation with building height of 23.00 + 3.70 m; 1 to 7 for residential. The ground floor of the Yellow River, silt silt, the lower part of the seventies shelled shelters, shelter vault and sidewalls of 120mm thick brick wall, the roof from the ground about 4.5m. When the building was built, the site was geophysically probed. The foundation pit with air-raid shelters dug about 7.0m below the ground, cleared the air-raid shelters within the basic range, blocked the shelter with brick walls, and rammed the ash-soil to the base floor. After the completion of the building did not appear large settlement, the use of normal. July 12, 1998 Zhengzhou heavy rain, Erdaojie and Ming Gong Road near the intersection of deep water, after the Second Street Jiekou large landslide occurred, a lot of rain into the collapse along the cave at the bottom of the shelter, Directly affect the ground foundation of Building No. 5-7, about 20m south. July 16 morning, city