论文部分内容阅读
摘要:在我国,水利水电工程承载着国民经济快速发展的重任,其质量直接关系国计民生的大事。对于水利水电工程来讲,地质条件下的边坡开挖及支护问题一直是其长期以来需要解决的主要问题,不仅影响着工程的顺利实施和运行,也影响着工程的施工质量。因此,本文以保证水利水电工程施工质量目的,初步分析与论述了其邊坡开挖和支护技术,以推动其不断发展与完善。
关键词:水利水电工程;边坡;支护;开挖
Abstract: in our country, the water conservancy and hydropower project is bearing the burden of the fast development of national economy, its quality directly relating to the relationship between the big things. For water conservancy and hydropower engineering terms, the geological conditions and the support of slope excavation has its long-standing need to solve problems, not only affects the smooth implementation of the project and operation, also affect the quality of construction projects. Therefore, this paper in order to ensure that the hydropower engineering construction quality objective, preliminary analysis and discusses its slope excavation and supporting technology, in order to promote the constant development and improvement.
Keywords: water conservancy and hydropower projects; Slope; Support; excavation
中图分类号:TV文献标识码:A 文章编号:
在水利水电工程施工过程中,基于地质条件下的边坡具有了复杂多变的特点,为边坡开挖和支护工程的施工带来了非常大的难度,影响了工程的顺利施工和质量安全。另一方面由于受到各种因素的影响,边坡开挖和支护阶段成为各种施工问题的高发阶段,为建筑企业带来了比较严重的经济损失。为了保证水利水电工程的顺利施工与质量安全,降低施工问题的发生和经济损失,有必要进一步分析与探讨边坡开挖和支护阶段施工流程、工艺及技术要点,对促进施工技术和保证施工质量具有非常的实用价值。
一、水利水电施工工程中边坡开挖的施工流程及工序
(一)技术交底
在施工准备阶段,建筑单位技术部人员必须对相关管理人员及施工作业管理人员进行技术交底,而现场管理人员及施工作业人员必须熟悉设计图纸、相关技术措施及规程规范的要求。倘若对技术交底内容怀有合理化的建议,应当向技术部申请,经核实同意后方可采纳并进行实施。
(二)测量放线
在开挖施工前,现场施工作业人员必须按照设计图纸及相关技术措施的要求对开挖轮廓线进行测量放线,保证测量放线点数满足施工质量及规格控制的要求。当开挖断面成型后,作业人员应当严格检测其是否满足设计及规范要求。倘若不满足应当及时进行处理,倘若满足相关要求则可进行下一环节的工作。
(三)洞室及竖井开挖
水利水电工程的边坡开挖主要采用钻爆发进行施工,并按照自上而下顺序分段、逐层进行。钻爆法的开挖方式主要包括逐层爆破开挖、台阶式分层爆破开挖及薄层爆破开挖。但是,无论是何种爆发方式都需要事先在边坡上钻出多个洞室和竖井,留做放置炸药。在洞室及竖井开挖过程中,施工作业人员必须根据技术措施要求进行开挖,超挖与欠挖必须严格控制在规范允许的范围之内,最重要的是控制洞室的造孔质量和装药参数。倘若遇到不良地质洞段,则应当严格按照“短进尺、弱爆破、强支护”的施工原则来进行。除此之外,还要严格依据开挖排炮进尺,尽量减少排炮错台,使排炮均匀分布在边坡表面。
(四)槽挖的施工方式
对于水利水电这种岩质边坡来讲,边坡开挖的钻爆设计是尤为重要的关键环节,对保证开挖质量、加快施工进度及提高施工效率具有非常重要的意义。技术部人员必须严格考察施工现场的实际情况及岩石结构去选择一套科学、合理的施工方法,并必须进行爆破性试验后来检验爆破参数的合理性。倘若发现不合理之处,应当及时对其进行调整和修整,直至满足技术措施的相关要求。在钻爆方式设计过程中,应当注意单响爆破药量及起爆顺序安排,还要采取一定的措施减少爆破振动对周围边坡岩体的损坏程度。
二、水利水电施工工程中边坡支护施工流程及工序
(一)锚杆、锚筋桩造孔
现场施工作业人员应当根据设计图纸所标注的位置和参数布置锚杆、锚筋桩孔位。与此同时,还要按照施工技术规范绘制锚杆、锚筋桩孔位布置图。其中,孔位偏差不能大于100mm,孔轴方向偏差不能大于5°,孔深偏差不能大于50mm。完成锚杆、锚筋桩钻孔工作后,务必将孔内残留碎石渣清理干净,并保证没有岩粉和积水。
(二)锚杆、锚筋桩注桩
锚杆、锚筋桩注桩工作主要包括三个步骤:拌制注桩砂浆、安插锚杆及锚杆注桩养护。下面将对以上三个方面的内容进行详细地探讨与分析。
1、拌制注桩砂浆
锚杆、锚筋桩造孔完成后,孔洞经相关单位监理验收合格后才能进行注浆和安插锚杆工作。其中,作业人员一定要严格按照事前实验得到的配合比配置锚杆砂浆,并采选用实验室开具的配料进行拌制。拌制砂浆用的水泥和砂子也要经过相关检验合格后才能使用。检验的主要内容包括水泥的强度、砂子的形状、大小尺寸、光滑程度等。在施工现场还要具备称量设备等器具,以保证砂浆的拌制质量和强度,然后将砂浆缓慢注入空洞中。
2、安插锚杆
在安插锚杆之前要检查锚杆的规格及尺寸是否符合设计要求,检查锚杆注浆是否饱满。安插锚杆后,空洞中的砂浆可能会有所溢出,必要时应当采取补浆措施。补浆中严禁采用对锚杆孔口抹浆的方式来掩饰孔内砂浆不饱满的问题。在一切准备工作完成后,作业人员便可将锚杆缓慢插入孔内。
3、锚杆注桩养护
为了保证锚杆具有一定的强度,应当持续养护一个月左右时间。在养护期间,有关技术人员还要定期或不定期地检测锚杆的密实程度。一但发现未能达到设计要求,一定要对不合格的锚杆采取补救措施,严格追求相关负责人的责任,并对其进行处罚。
(三)挂网喷混凝土
在进行挂网喷混凝土前应当确认此处是否进行过开挖验收,保证岩面没有松散的石渣和松土,这样混凝土与岩面才能具有较好的粘结效果。然后按照施工设计要求,选用符合标准的挂网材料,网格尺寸也要满足设计规范和要求。同时,必须保证钢筋网与锚杆连接牢固,且与岩面的距离符合设计要求。只有在一切影响因素得到控制的前提下,混凝土的施工质量才会有所保障。
同样,混凝土的配置材料也要经过有关检测技术的检验,检验合格后方可使用。通常情况下,最好不要采用人工拌制,应当采用专业的混凝土搅拌机来搅拌,以保证混凝土的拌制质量。混凝土拌制工作完成后,开始准备喷混凝土。喷混凝土应当采用分区、分片、分层的方式,注意保证混凝土喷层的均匀性和连续性,以及喷层的厚度。混凝土喷层的局部厚度最好不要小于设计要求的60%,平均厚度应当满足设计要求。由于采用的是分层喷混凝土的方式,两层混凝土之间的间隔时间应当大于一个小时,才能保证喷层不夹渣、不包砂,具有良好的混凝土喷制效果。当所有挂网喷混凝土施工完成后,则进入养护阶段。
养护阶段是混凝土强度形成和定型的重要时期,任何工程项目施工都不能忽视这一阶段。此阶段的混凝土养护仍然需要持续一个月左右时间,并在过程中测量混凝土的强度和抗压能力。倘若混凝土强度和抗压能力尚未满足边坡施工的技术要求,定要进行必要的处理措施。其中,最重要的一项测量内容就是混凝土的厚度。一旦厚度满足施工设计要求,混凝土的强度也会得到有力保障。
三、结束语
通过本文的论述与分析,使我们较为全面地了解和掌握了水利水电施工工程中边坡开挖和支护的施工流程、工艺及技术要点。为了减少边坡开挖支护阶段的施工问题,建筑单位的技术部门和现场施工作业人员一定要严格按照相关技术规范和要求,全面考虑施工过程中诸多影响要素,注意每一道施工工艺和技术,才能保证水利水电工程具有良好的边坡施工质量。
参考文献:
[1] 张东升,赵建中,魏剑宏. 小浪底水利工程高边坡加固措施及安全评价 [J]. 人民黄河, 2003.(12).
[2] 彭卫,孟旭央. 小浪底水利枢纽进口岩石高边坡稳定分析和加固处理 [J]. 工程建设与设计, 2007.(05).
[3] 万林伟. 水利水电工程中的安全生产及其管理[J]. 河南水利与南水北调. 2008. (06).
[4] 石荣钢. 水利水电工程施工安全管理分析与实践[J]. 科技风. 2009. (09).
[5] 王志强. 乌鲁瓦提水利枢纽工程左坝肩高边坡不稳定岩体处理 [J]. 水利建设与管理, 2010.(08).
关键词:水利水电工程;边坡;支护;开挖
Abstract: in our country, the water conservancy and hydropower project is bearing the burden of the fast development of national economy, its quality directly relating to the relationship between the big things. For water conservancy and hydropower engineering terms, the geological conditions and the support of slope excavation has its long-standing need to solve problems, not only affects the smooth implementation of the project and operation, also affect the quality of construction projects. Therefore, this paper in order to ensure that the hydropower engineering construction quality objective, preliminary analysis and discusses its slope excavation and supporting technology, in order to promote the constant development and improvement.
Keywords: water conservancy and hydropower projects; Slope; Support; excavation
中图分类号:TV文献标识码:A 文章编号:
在水利水电工程施工过程中,基于地质条件下的边坡具有了复杂多变的特点,为边坡开挖和支护工程的施工带来了非常大的难度,影响了工程的顺利施工和质量安全。另一方面由于受到各种因素的影响,边坡开挖和支护阶段成为各种施工问题的高发阶段,为建筑企业带来了比较严重的经济损失。为了保证水利水电工程的顺利施工与质量安全,降低施工问题的发生和经济损失,有必要进一步分析与探讨边坡开挖和支护阶段施工流程、工艺及技术要点,对促进施工技术和保证施工质量具有非常的实用价值。
一、水利水电施工工程中边坡开挖的施工流程及工序
(一)技术交底
在施工准备阶段,建筑单位技术部人员必须对相关管理人员及施工作业管理人员进行技术交底,而现场管理人员及施工作业人员必须熟悉设计图纸、相关技术措施及规程规范的要求。倘若对技术交底内容怀有合理化的建议,应当向技术部申请,经核实同意后方可采纳并进行实施。
(二)测量放线
在开挖施工前,现场施工作业人员必须按照设计图纸及相关技术措施的要求对开挖轮廓线进行测量放线,保证测量放线点数满足施工质量及规格控制的要求。当开挖断面成型后,作业人员应当严格检测其是否满足设计及规范要求。倘若不满足应当及时进行处理,倘若满足相关要求则可进行下一环节的工作。
(三)洞室及竖井开挖
水利水电工程的边坡开挖主要采用钻爆发进行施工,并按照自上而下顺序分段、逐层进行。钻爆法的开挖方式主要包括逐层爆破开挖、台阶式分层爆破开挖及薄层爆破开挖。但是,无论是何种爆发方式都需要事先在边坡上钻出多个洞室和竖井,留做放置炸药。在洞室及竖井开挖过程中,施工作业人员必须根据技术措施要求进行开挖,超挖与欠挖必须严格控制在规范允许的范围之内,最重要的是控制洞室的造孔质量和装药参数。倘若遇到不良地质洞段,则应当严格按照“短进尺、弱爆破、强支护”的施工原则来进行。除此之外,还要严格依据开挖排炮进尺,尽量减少排炮错台,使排炮均匀分布在边坡表面。
(四)槽挖的施工方式
对于水利水电这种岩质边坡来讲,边坡开挖的钻爆设计是尤为重要的关键环节,对保证开挖质量、加快施工进度及提高施工效率具有非常重要的意义。技术部人员必须严格考察施工现场的实际情况及岩石结构去选择一套科学、合理的施工方法,并必须进行爆破性试验后来检验爆破参数的合理性。倘若发现不合理之处,应当及时对其进行调整和修整,直至满足技术措施的相关要求。在钻爆方式设计过程中,应当注意单响爆破药量及起爆顺序安排,还要采取一定的措施减少爆破振动对周围边坡岩体的损坏程度。
二、水利水电施工工程中边坡支护施工流程及工序
(一)锚杆、锚筋桩造孔
现场施工作业人员应当根据设计图纸所标注的位置和参数布置锚杆、锚筋桩孔位。与此同时,还要按照施工技术规范绘制锚杆、锚筋桩孔位布置图。其中,孔位偏差不能大于100mm,孔轴方向偏差不能大于5°,孔深偏差不能大于50mm。完成锚杆、锚筋桩钻孔工作后,务必将孔内残留碎石渣清理干净,并保证没有岩粉和积水。
(二)锚杆、锚筋桩注桩
锚杆、锚筋桩注桩工作主要包括三个步骤:拌制注桩砂浆、安插锚杆及锚杆注桩养护。下面将对以上三个方面的内容进行详细地探讨与分析。
1、拌制注桩砂浆
锚杆、锚筋桩造孔完成后,孔洞经相关单位监理验收合格后才能进行注浆和安插锚杆工作。其中,作业人员一定要严格按照事前实验得到的配合比配置锚杆砂浆,并采选用实验室开具的配料进行拌制。拌制砂浆用的水泥和砂子也要经过相关检验合格后才能使用。检验的主要内容包括水泥的强度、砂子的形状、大小尺寸、光滑程度等。在施工现场还要具备称量设备等器具,以保证砂浆的拌制质量和强度,然后将砂浆缓慢注入空洞中。
2、安插锚杆
在安插锚杆之前要检查锚杆的规格及尺寸是否符合设计要求,检查锚杆注浆是否饱满。安插锚杆后,空洞中的砂浆可能会有所溢出,必要时应当采取补浆措施。补浆中严禁采用对锚杆孔口抹浆的方式来掩饰孔内砂浆不饱满的问题。在一切准备工作完成后,作业人员便可将锚杆缓慢插入孔内。
3、锚杆注桩养护
为了保证锚杆具有一定的强度,应当持续养护一个月左右时间。在养护期间,有关技术人员还要定期或不定期地检测锚杆的密实程度。一但发现未能达到设计要求,一定要对不合格的锚杆采取补救措施,严格追求相关负责人的责任,并对其进行处罚。
(三)挂网喷混凝土
在进行挂网喷混凝土前应当确认此处是否进行过开挖验收,保证岩面没有松散的石渣和松土,这样混凝土与岩面才能具有较好的粘结效果。然后按照施工设计要求,选用符合标准的挂网材料,网格尺寸也要满足设计规范和要求。同时,必须保证钢筋网与锚杆连接牢固,且与岩面的距离符合设计要求。只有在一切影响因素得到控制的前提下,混凝土的施工质量才会有所保障。
同样,混凝土的配置材料也要经过有关检测技术的检验,检验合格后方可使用。通常情况下,最好不要采用人工拌制,应当采用专业的混凝土搅拌机来搅拌,以保证混凝土的拌制质量。混凝土拌制工作完成后,开始准备喷混凝土。喷混凝土应当采用分区、分片、分层的方式,注意保证混凝土喷层的均匀性和连续性,以及喷层的厚度。混凝土喷层的局部厚度最好不要小于设计要求的60%,平均厚度应当满足设计要求。由于采用的是分层喷混凝土的方式,两层混凝土之间的间隔时间应当大于一个小时,才能保证喷层不夹渣、不包砂,具有良好的混凝土喷制效果。当所有挂网喷混凝土施工完成后,则进入养护阶段。
养护阶段是混凝土强度形成和定型的重要时期,任何工程项目施工都不能忽视这一阶段。此阶段的混凝土养护仍然需要持续一个月左右时间,并在过程中测量混凝土的强度和抗压能力。倘若混凝土强度和抗压能力尚未满足边坡施工的技术要求,定要进行必要的处理措施。其中,最重要的一项测量内容就是混凝土的厚度。一旦厚度满足施工设计要求,混凝土的强度也会得到有力保障。
三、结束语
通过本文的论述与分析,使我们较为全面地了解和掌握了水利水电施工工程中边坡开挖和支护的施工流程、工艺及技术要点。为了减少边坡开挖支护阶段的施工问题,建筑单位的技术部门和现场施工作业人员一定要严格按照相关技术规范和要求,全面考虑施工过程中诸多影响要素,注意每一道施工工艺和技术,才能保证水利水电工程具有良好的边坡施工质量。
参考文献:
[1] 张东升,赵建中,魏剑宏. 小浪底水利工程高边坡加固措施及安全评价 [J]. 人民黄河, 2003.(12).
[2] 彭卫,孟旭央. 小浪底水利枢纽进口岩石高边坡稳定分析和加固处理 [J]. 工程建设与设计, 2007.(05).
[3] 万林伟. 水利水电工程中的安全生产及其管理[J]. 河南水利与南水北调. 2008. (06).
[4] 石荣钢. 水利水电工程施工安全管理分析与实践[J]. 科技风. 2009. (09).
[5] 王志强. 乌鲁瓦提水利枢纽工程左坝肩高边坡不稳定岩体处理 [J]. 水利建设与管理, 2010.(08).