【摘要】深基坑边坡支护施工是整个深基坑施工的重点,它是确保在基坑土方开挖和基础施工时,基坑边坡不产生失稳和坍塌的关键。在深基坑边坡支护施工中,监理如何去控制好边坡支护的施工质量,确保深基坑的边坡在支护后,能保证持续稳定和安全,本文结合一工程深基坑边坡支护的成功案例,谈谈在深基坑边坡支护施工中,监理工作的几个要点。
【关键词】深基坑边坡支护;监理工作要点
Key Points in Construction Supervision of Slope Support in Deep Foundation
Zhang Xiao-lin,Yang Qiu-liang
(FYI Engineering Construction Supervision Co., LtdFenyiJiangxi336600)
【Abstract】The deep foundation pit slope supporting construction is the key point of the deep foundation pit construction, which is the key to ensure the foundation pit excavation and foundation construction, the slope does not produce instability and collapse. In the deep foundation pit slope supporting construction, the supervision how to control the construction quality of the slope support, to ensure that the deep foundation pit slope after the support, to ensure the stability and safety, this article combines a deep foundation pit Slope supporting the success of the case, to talk about the deep foundation pit slope support construction supervision work of several points.
【Key words】Deep foundation pit slope support;Key points of supervision work
深基坑是指基坑开挖深度超过5m,且地下水位又在基坑开挖范围内的基坑。深基坑开挖时,需要对其边坡进行支护,以确保在基坑土方开挖时和以后的基础施工中,基坑边坡不产生失稳和坍塌,能持续保证土方开挖和基础施工时的安全。那么,在深基坑边坡支护施工中,作为工程监理应当作些什么工作,如何去控制好深基坑边坡支护的施工质量,本文结合工程实践,谈谈在深基坑边坡支护施工中,监理工作的几个要点。
1. 工程慨况:
1.1紫城中心花苑工程位于分宜县城北侧,建筑面积为123320m2,占地面积为15646m2,该工程设有六层裙楼(其中地下两层,地面四层),裙楼上设有三栋28层的塔楼,基础为整体现浇钢筋混凝土筏板基础,基底标高为-10.9m,距自然地面深9.4m。由于基坑开挖深度超过5m,该基坑开挖属于深基坑开挖。
1.2根据地质工程勘察部门提供的该工程地基岩土勘察报告,其地质情况自上而下描述为:①杂填土:由建筑垃圾、粘土等组成,平均厚度为1.83m;②全风化泥质灰岩,其岩芯完全风化成土状,成份以泥质粉砂为主,平均厚度为2.94m;③强风化泥质灰岩,岩结构基本成土状,岩芯呈土状和碎块状,平均厚度1.17m;④中风化泥质灰岩,裂隙发育较多,岩芯呈短柱状,平均厚度为3.5m。⑤微风化灰岩。
1.3该工程地质水文情况:①杂填土透水性中等,有地表水渗透;②地下水埋深距地表-4.1m左右,地下水欠丰富;③地下水分两层,一类为上层滞水,水量较弱,不具有承压性,另一类为存于下伏基岩裂隙中的承压水,虽水量相对微弱,但遇到时突发性很强,施工时应注意。
1.4由于该工程地处分宜县城闹市区,东邻分宜县第三小学,西靠昌山北路主干道,南靠钤山东路主干道,北邻华厦星城小区,施工场地十分陕小,不能采取全放坡开挖,只能采取局部小放坡和垂直开挖,并采取边开挖边支护的施工方法。深基坑边坡支护的施工图由专业设计院负责设计,深基坑边坡支护也由专业施工队负责施工。
2. 深基坑边坡支护的主要施工内容:
东面主要采用22螺纹钢筋作锚杆土钉墙的边坡支护(锚杆土钉长6m,纵横间距1.5m)、土钉墙面挂6.5@200×200的钢筋网、再喷射50mm厚C20混凝土;南面主要采用双排微型钢管桩(桩径130,桩深15m,桩间距800mm),并同时采用22螺纹钢筋作锚杆土钉墙的边坡支护(锚杆土钉长9m,间距1.5m)、土钉墙面挂钢筋网(6.5@200×200)、再喷射50mm厚C20混凝土;西、北两面在采用22螺纹钢筋作锚杆土钉墙边坡支护(锚杆土钉长9m,间距1.5m)、面挂钢筋网(6.5@200×200)、喷射50mm厚C20混凝后;再用预应力锚索(3×75)作边坡支护加固(预应力锚索长约25~35m,纵横间距2m,要求入中风化泥质灰岩不小于5m,锚索设计锁定力为200KN,锚头采用22号槽钢连锁)。
3. 深基坑边坡支护的主要施工程序:
制定施工方案--测量放线--微型钢管桩施工--第一阶段
土方开挖(开挖深度3m)--第一阶段边坡支护(钢筋锚杆土钉墙支护;面挂钢筋网、喷射混凝土面 层)--第二阶段土方开挖(开挖深度2.4m)--第二阶段边坡支护(预应力锚索施工;钢筋锚杆土钉
支护;面挂钢筋网、喷射混凝土面层)--第三阶段土方开挖(开挖深度2.0m)--第三阶段边坡支护(预
应力锚索施工;钢筋锚杆土钉支护;面挂钢筋网、喷射混凝土面层)--第四阶段土方开挖(开挖深度
2.0m)--第四阶段边坡支护(预应力锚索施工;钢筋锚杆土钉支护;面挂钢筋网、喷射混凝土面
层)。
4. 在深基坑边坡支护施工中监理工作的几个要点:
4.1对深基坑边坡支护施工方案的审核:由于该基坑土方开挖属于深基坑土方开挖,存在边坡失稳、塌方等重大危险源,所以在基坑土方开挖前要求施工单位编写"深基坑土方开挖及边坡支护安全专项施工方案",并要求施工单位组织相关专家对方案进行可行性论证。方案经论证修改后再报监理进行审批,监理审批时要重点审查施工方案中重大危险源的识别与监控措施,边坡支护的主要施工方案及设计验算;土方开挖及边坡支护施工时的变形监测;方案实施时遇突发事件的预警以及安全生产应急预案等。方案经审查合格后,方可批准按其方案施工。同时针对该方案,项目监理部也要编写"深基坑开挖及边坡支护施工监理实施细则"。
4.2在深基坑边坡支护施工过程中,项目监理部应控制的几个关键部位:
4.2.1对微型钢管桩施工的监控:微型钢管桩施工应在第一次土方开挖前实施,对每钻成一孔,要督促施工单位及时下管,并及时向管内浇灌C20的细石混凝土,以防塌孔和堵管。在管内混凝土达到强度的80%后,再用钢管将管桩顶部连焊成一整体,使各管桩一齐共同抵抗在基坑土方开挖时,边坡土形成的侧压力。施工中,监理要监督并旁站下管和浇灌混凝土施工的全过程。
4.2.2对土钉墙边坡施工的监控:首先土钉的钻孔与注浆是土钉墙边坡支护的质量控制要点,土钉墙边坡支护的稳定主要是靠土钉锚入土内的抗拔力和表面喷射钢筋混凝土整体强度所决定的。所以必须严格控制土钉钻孔的入土深度和坡度以及孔内注浆量和密实度。其次对土钉面挂钢筋网、喷射混凝土的厚度和强度控制,也是防止土钉墙边坡失稳的一个关键。施工时,监理要监督并旁站注浆和喷射混凝土施工的全过程。
4.2.3对预应力锚索施工的监控:首先要严格控制预应力锚索钻孔的坡度和入岩深度,钻孔坡度和入岩深度是保证预应力锚索能达到设计锁定力的最基本要求。其次是控制预应力锚索孔内的水泥注浆量和密实度,注浆量和密实度是保证张拉能否顺利达到设计张拉应力的关键。再是把握好预应力锚索的张拉时间和张拉应力,张拉时间必须是在孔内水泥浆强度达到设计要求的注浆强度的时间。锚索张拉前,应检查其锚具、夹具和张拉设备是否符合要求,经检查符合要求后方可允许张拉。张拉时要严格控制张拉应力和锚索的伸长值,确保稳定后的张拉应力值不小于设计的锁定力。项目监理部要派员监督并旁站注浆和张拉施工的全过程。
4.2.4对深基坑边坡支护的施工监测:深基坑及边坡支护施工时,应加强对基坑周边地面和建(构)筑物的变形进行监测。监理要对监测点的设置,监测频率,监测数据的分析,要作全面控制,发现异常,要及时预警。
4.3在深基坑边坡支护施工中,监理对遇突发问题的处理:
4.3.1在土钉钻注浆孔时遇裂隙中突发涌水,造成局部边坡坍塌。监理发现时及时发出预警,指令暂停施工,并立即提出了对该部进行处理的措施:将水引入盲沟排走;挖去坍塌部分;向裂隙中加大注浆量,将水全部挤出,然后用预应力锚索作边坡加固。
4.3.2在钻锚索注浆孔时,北面小区路面发生塌陷。产生的主要原因是钻孔时遇到溶洞,洞内承压水产生外流,造成地面塌陷。监理发现后,立即提出了处理方法:先停止钻孔,并用压浆泵将水泥浆注入溶洞内,使其充满全洞,以保证地面不塌陷,待水泥浆产生强度后,再继续钻孔施工。
4.4对深基坑边坡支护施工质量的验收:深基坑边坡支护施工完成后,应由总监理工程师组织有关人员进行质量验收。验收的主要内容包括边坡支护施工的各分项工程质量情况:如微型钢管桩的稳定情况,锚杆土钉墙的稳定情况,锚喷混凝土面与基坑土层面的结合情况,锚喷面的泄水孔和排水设施是否符合要求,预应力锚索的锚固情况,边坡的变形观测情况,所有边坡支护的施工技术资料情况。在这些项目的内容都符合要求后,方可签署相关验收文件。
5. 结束语:
深基坑边坡支护施工质量的好坏,直接影响到土方开挖和基础施工时的边坡稳定,以及施工作业人员的人身安全。所以监理在边坡支护施工中,严格控制好边坡支护的施工质量,它是确保以后基础能否顺利施工的关键。
[作者简介] 张晓林,男,学历:大专,职称:工程师,监理工程师,工作单位:分宜县工程建设监理有限公司。
杨秋亮,男,学历:本科,职称:高级工程师,国家注册监理工程师,工作单位:分宜县工程建设监理有限公司。
【关键词】深基坑边坡支护;监理工作要点
Key Points in Construction Supervision of Slope Support in Deep Foundation
Zhang Xiao-lin,Yang Qiu-liang
(FYI Engineering Construction Supervision Co., LtdFenyiJiangxi336600)
【Abstract】The deep foundation pit slope supporting construction is the key point of the deep foundation pit construction, which is the key to ensure the foundation pit excavation and foundation construction, the slope does not produce instability and collapse. In the deep foundation pit slope supporting construction, the supervision how to control the construction quality of the slope support, to ensure that the deep foundation pit slope after the support, to ensure the stability and safety, this article combines a deep foundation pit Slope supporting the success of the case, to talk about the deep foundation pit slope support construction supervision work of several points.
【Key words】Deep foundation pit slope support;Key points of supervision work
深基坑是指基坑开挖深度超过5m,且地下水位又在基坑开挖范围内的基坑。深基坑开挖时,需要对其边坡进行支护,以确保在基坑土方开挖时和以后的基础施工中,基坑边坡不产生失稳和坍塌,能持续保证土方开挖和基础施工时的安全。那么,在深基坑边坡支护施工中,作为工程监理应当作些什么工作,如何去控制好深基坑边坡支护的施工质量,本文结合工程实践,谈谈在深基坑边坡支护施工中,监理工作的几个要点。
1. 工程慨况:
1.1紫城中心花苑工程位于分宜县城北侧,建筑面积为123320m2,占地面积为15646m2,该工程设有六层裙楼(其中地下两层,地面四层),裙楼上设有三栋28层的塔楼,基础为整体现浇钢筋混凝土筏板基础,基底标高为-10.9m,距自然地面深9.4m。由于基坑开挖深度超过5m,该基坑开挖属于深基坑开挖。
1.2根据地质工程勘察部门提供的该工程地基岩土勘察报告,其地质情况自上而下描述为:①杂填土:由建筑垃圾、粘土等组成,平均厚度为1.83m;②全风化泥质灰岩,其岩芯完全风化成土状,成份以泥质粉砂为主,平均厚度为2.94m;③强风化泥质灰岩,岩结构基本成土状,岩芯呈土状和碎块状,平均厚度1.17m;④中风化泥质灰岩,裂隙发育较多,岩芯呈短柱状,平均厚度为3.5m。⑤微风化灰岩。
1.3该工程地质水文情况:①杂填土透水性中等,有地表水渗透;②地下水埋深距地表-4.1m左右,地下水欠丰富;③地下水分两层,一类为上层滞水,水量较弱,不具有承压性,另一类为存于下伏基岩裂隙中的承压水,虽水量相对微弱,但遇到时突发性很强,施工时应注意。
1.4由于该工程地处分宜县城闹市区,东邻分宜县第三小学,西靠昌山北路主干道,南靠钤山东路主干道,北邻华厦星城小区,施工场地十分陕小,不能采取全放坡开挖,只能采取局部小放坡和垂直开挖,并采取边开挖边支护的施工方法。深基坑边坡支护的施工图由专业设计院负责设计,深基坑边坡支护也由专业施工队负责施工。
2. 深基坑边坡支护的主要施工内容:
东面主要采用22螺纹钢筋作锚杆土钉墙的边坡支护(锚杆土钉长6m,纵横间距1.5m)、土钉墙面挂6.5@200×200的钢筋网、再喷射50mm厚C20混凝土;南面主要采用双排微型钢管桩(桩径130,桩深15m,桩间距800mm),并同时采用22螺纹钢筋作锚杆土钉墙的边坡支护(锚杆土钉长9m,间距1.5m)、土钉墙面挂钢筋网(6.5@200×200)、再喷射50mm厚C20混凝土;西、北两面在采用22螺纹钢筋作锚杆土钉墙边坡支护(锚杆土钉长9m,间距1.5m)、面挂钢筋网(6.5@200×200)、喷射50mm厚C20混凝后;再用预应力锚索(3×75)作边坡支护加固(预应力锚索长约25~35m,纵横间距2m,要求入中风化泥质灰岩不小于5m,锚索设计锁定力为200KN,锚头采用22号槽钢连锁)。
3. 深基坑边坡支护的主要施工程序:
制定施工方案--测量放线--微型钢管桩施工--第一阶段
土方开挖(开挖深度3m)--第一阶段边坡支护(钢筋锚杆土钉墙支护;面挂钢筋网、喷射混凝土面 层)--第二阶段土方开挖(开挖深度2.4m)--第二阶段边坡支护(预应力锚索施工;钢筋锚杆土钉
支护;面挂钢筋网、喷射混凝土面层)--第三阶段土方开挖(开挖深度2.0m)--第三阶段边坡支护(预
应力锚索施工;钢筋锚杆土钉支护;面挂钢筋网、喷射混凝土面层)--第四阶段土方开挖(开挖深度
2.0m)--第四阶段边坡支护(预应力锚索施工;钢筋锚杆土钉支护;面挂钢筋网、喷射混凝土面
层)。
4. 在深基坑边坡支护施工中监理工作的几个要点:
4.1对深基坑边坡支护施工方案的审核:由于该基坑土方开挖属于深基坑土方开挖,存在边坡失稳、塌方等重大危险源,所以在基坑土方开挖前要求施工单位编写"深基坑土方开挖及边坡支护安全专项施工方案",并要求施工单位组织相关专家对方案进行可行性论证。方案经论证修改后再报监理进行审批,监理审批时要重点审查施工方案中重大危险源的识别与监控措施,边坡支护的主要施工方案及设计验算;土方开挖及边坡支护施工时的变形监测;方案实施时遇突发事件的预警以及安全生产应急预案等。方案经审查合格后,方可批准按其方案施工。同时针对该方案,项目监理部也要编写"深基坑开挖及边坡支护施工监理实施细则"。
4.2在深基坑边坡支护施工过程中,项目监理部应控制的几个关键部位:
4.2.1对微型钢管桩施工的监控:微型钢管桩施工应在第一次土方开挖前实施,对每钻成一孔,要督促施工单位及时下管,并及时向管内浇灌C20的细石混凝土,以防塌孔和堵管。在管内混凝土达到强度的80%后,再用钢管将管桩顶部连焊成一整体,使各管桩一齐共同抵抗在基坑土方开挖时,边坡土形成的侧压力。施工中,监理要监督并旁站下管和浇灌混凝土施工的全过程。
4.2.2对土钉墙边坡施工的监控:首先土钉的钻孔与注浆是土钉墙边坡支护的质量控制要点,土钉墙边坡支护的稳定主要是靠土钉锚入土内的抗拔力和表面喷射钢筋混凝土整体强度所决定的。所以必须严格控制土钉钻孔的入土深度和坡度以及孔内注浆量和密实度。其次对土钉面挂钢筋网、喷射混凝土的厚度和强度控制,也是防止土钉墙边坡失稳的一个关键。施工时,监理要监督并旁站注浆和喷射混凝土施工的全过程。
4.2.3对预应力锚索施工的监控:首先要严格控制预应力锚索钻孔的坡度和入岩深度,钻孔坡度和入岩深度是保证预应力锚索能达到设计锁定力的最基本要求。其次是控制预应力锚索孔内的水泥注浆量和密实度,注浆量和密实度是保证张拉能否顺利达到设计张拉应力的关键。再是把握好预应力锚索的张拉时间和张拉应力,张拉时间必须是在孔内水泥浆强度达到设计要求的注浆强度的时间。锚索张拉前,应检查其锚具、夹具和张拉设备是否符合要求,经检查符合要求后方可允许张拉。张拉时要严格控制张拉应力和锚索的伸长值,确保稳定后的张拉应力值不小于设计的锁定力。项目监理部要派员监督并旁站注浆和张拉施工的全过程。
4.2.4对深基坑边坡支护的施工监测:深基坑及边坡支护施工时,应加强对基坑周边地面和建(构)筑物的变形进行监测。监理要对监测点的设置,监测频率,监测数据的分析,要作全面控制,发现异常,要及时预警。
4.3在深基坑边坡支护施工中,监理对遇突发问题的处理:
4.3.1在土钉钻注浆孔时遇裂隙中突发涌水,造成局部边坡坍塌。监理发现时及时发出预警,指令暂停施工,并立即提出了对该部进行处理的措施:将水引入盲沟排走;挖去坍塌部分;向裂隙中加大注浆量,将水全部挤出,然后用预应力锚索作边坡加固。
4.3.2在钻锚索注浆孔时,北面小区路面发生塌陷。产生的主要原因是钻孔时遇到溶洞,洞内承压水产生外流,造成地面塌陷。监理发现后,立即提出了处理方法:先停止钻孔,并用压浆泵将水泥浆注入溶洞内,使其充满全洞,以保证地面不塌陷,待水泥浆产生强度后,再继续钻孔施工。
4.4对深基坑边坡支护施工质量的验收:深基坑边坡支护施工完成后,应由总监理工程师组织有关人员进行质量验收。验收的主要内容包括边坡支护施工的各分项工程质量情况:如微型钢管桩的稳定情况,锚杆土钉墙的稳定情况,锚喷混凝土面与基坑土层面的结合情况,锚喷面的泄水孔和排水设施是否符合要求,预应力锚索的锚固情况,边坡的变形观测情况,所有边坡支护的施工技术资料情况。在这些项目的内容都符合要求后,方可签署相关验收文件。
5. 结束语:
深基坑边坡支护施工质量的好坏,直接影响到土方开挖和基础施工时的边坡稳定,以及施工作业人员的人身安全。所以监理在边坡支护施工中,严格控制好边坡支护的施工质量,它是确保以后基础能否顺利施工的关键。
[作者简介] 张晓林,男,学历:大专,职称:工程师,监理工程师,工作单位:分宜县工程建设监理有限公司。
杨秋亮,男,学历:本科,职称:高级工程师,国家注册监理工程师,工作单位:分宜县工程建设监理有限公司。