分组合作学习在《Flash动画制作》教学中的探索与实践

来源 :中小学电教(下半月) | 被引量 : 0次 | 上传用户:yueer40849263
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Flash动画制作是一门以上机操作为主、实践性很强的一门学科,是中职学校的主干课程是职业中专生源文化基础相对薄弱,在教学中采用异质分组合作学习,解决了大班额教学困难的情况,同时引进竞争机制,能充分调动学生学习的积极性,激发学生的创造性思维,从而收到良好的教学效果。 Flash animation is more than one machine-based operation, a very practical discipline, is the main course of secondary vocational school students vocational and secondary students is relatively weak cultural base in the teaching of heterogeneous group cooperation to learn and solve The difficulty of teaching large classes, while the introduction of competition mechanisms, can fully mobilize the enthusiasm of students learn and stimulate students’ creative thinking, which received good teaching results.
其他文献
AIM:To identify the role of survivin in colorectal carcinogenesisand the relationship between Survivin and histologicaldifferentiation grade of colorectal carc
AIM:To explore the role and significance of costimulatorymolecules B7H1,B7H2 and ICOS within tissues of humangastric carcinoma and the possible mechanisms in t
一、概况以礼河电厂三、四级电站各装有四台捷克制造的 P_a—170冲击式水轮发电机组。其水轮机参数如下:额定功率:42000kW 设计水头:589m最高水头:629m 额定流量:7.25m I.
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
一、一个值得高度重视的新课题 目前,全国各发电设备生产厂家及有关的外贸公司都在努力开拓机电国际市场,不断拓宽营销渠道。自八十年代以来,先后在天生侨、水口、隔河岩、
我县地处里下河下游,地势低洼,易涝易溃。70年代和80年代初兴建的500多座轴流泵站,基本上都是用的20ZLB-70型泵,由于扬程低(都在2.0以下),泵站装置效率普遍不高,一般在35%~40%
1、罗马尼亚近年来建筑的土石坝罗马尼亚于1953~1982年期间,曾修建了综合利用的大坝达101座,其中大多数为土石坝.兹举出堆石坝8座,其中4座为混凝土面板坝,4座为不透水心墙坝.
小型水电站在经济和技术方面的优点,常不被人们真正了解,其原因是评价方法有时侯不恰当。作者提出一种更好的评价小水电价值的方法。小型水电站和大型水电站装机容量之间的
AIM:To study the expression of survivin,an inhibitor ofapoptosis protein,in human gastric carcinomas and gastriccarcinoma models of rats.METHODS:With the metho
李四光地质科学荣誉奖获得者 :叶连俊 中国科学院地质与地球物理研究所研究员、中国科学院院士杨 起 中国地质大学 (北京 )教授、中国科学院院士张彭熹 中国科学院青海盐