论文部分内容阅读
详细介绍了泰国曼谷南外环线上主垮500 m的SOBRR叠合梁斜拉桥的主要施工方法,如节段的安装,悬臂施工主梁的水平锚固、边墩和边主梁联结、边跨平衡重及主跨的合龙等.
The main construction methods of the SOBRR composite cable-stayed bridge with a main collapse of 500 m on the South Outer Ring Road in Bangkok, Thailand are described in detail, such as the installation of the section, the horizontal anchorage of the main girder of the cantilever construction, the connection of the side pier and the side girder, Balance weight and the main span of closure and so on.