土耳其南部的奇内坝与奇内河以及其南岸的城市同名 ,目前正在施工。工程包括一座 135m高的RCC坝、一座自由溢流堰顶溢洪道 ,一座 4 2 .5m高的RCC围堰 ,右岸有一条导流隧洞 /深孔 ,左岸的厂房进水口与一条 2 .5km长的隧洞和一座 4 0MW的电站连接。RCC围堰位于导
The Chitaneba in southern Turkey has the same name as the Chiani River and its southern bank city and is currently under construction. The project consists of a 135-meter-high RCC dam, a free-flow weir spillway, a 42.5-meter-high RCC cofferdam and a diversion tunnel / deep hole on the right bank. The left bank’s water inlet of the plant and a 2.5-km The tunnel is connected to a 40MW plant. RCC cofferdams are located in the guide