一条公路施工,测量放样始终贯穿整个过程。对于每一位测量人员来讲,由于恶劣的天气,复杂的地形,测量标志总有可能丢失或因掩埋而遭到破坏。无疑测量标志的丢失将给我们的工作带来诸多不便。初步设计、施工图设计都是在原地表无干扰的情况下完成的。施工交桩时,原地表标志物、
A road construction, measurement and lofting throughout the entire process. For each surveyor, due to bad weather, complex terrain, measurement signs are always likely to be lost or destroyed due to burial. There is no doubt that the loss of measurement signs will bring a lot of inconvenience to our work. Preliminary design, construction design are in the original surface without interference under the circumstances. Construction of cross-pile, the original surface markers,