几年来,原锦州铁路局工务工程段的广大职工,认真贯彻《鞍钢宪法》,深入开展“工业学大庆”的群众运动,不断改革技术设备,逐渐实现线路大修施工机械化,从而提高了线路质量,保证了线路状态的经常良好。现将他们在线路大修机械化施工方面的经验介绍给读者。由于篇幅限制,需分两期刊登,本期主要介绍大修施工的基本概况,下期续登大修作业中使用的施工机械。
Over the past few years, the vast majority of staff and workers of the Jinzhou Railway Administration’s Public Works Project conscientiously implemented the Anshan Iron and Steel Constitution, conducted a mass movement of “Daqing in industry”, continuously reformed technical equipment and gradually mechanized the construction of line overhauls to improve line quality, Ensure that the line state is often good. Now they introduce the experience of overhauling mechanized construction on the line to readers. Due to space limitations, it is required to publish in two phases. This issue mainly introduces the basic situation of overhaul construction and the construction machinery used in the overhaul work in the next period.