论文部分内容阅读
我省今年夏季遭受了严重的水灾,在水灾发生后,即以生产救灾工作为压倒一切的中心任务,现将此一工作进行的情况简略报告如下:一、今年六七月间,我们集中了一切的力量,进行防汛、抢救工作,并把这个工作当作紧急的战斗任务。在防汛工作方面:当汛期未到来时,即建立了防汛指挥机构,进行了各项准备工作;汛期一开始,即动员和组织了上百万的民工、部队等投入防汛前哨,在淮堤江堤及内河堤漫长的防綫上与洪水进行日以继夜的、持续的斗争。在「水涨堤高」「人定胜天」等口
In the summer of this year, our province suffered a serious flood disaster. After the flood occurred, that is, it was the overriding task of producing disaster relief work. The brief report on the work carried out by this province is as follows: 1. In June and July this year, we concentrated All forces, flood control, rescue work, and the work as an urgent battle mission. In the aspect of flood control work: when the flood season did not come, flood control headquarters were set up and various preparatory work was carried out. From the beginning of the flood season, millions of migrant workers and troops were mobilized and organized into flood control outposts, Dike and river embankment long line of defense with the flood day and night, sustained struggle. In the “water up high embankment” and “human victory days” and other mouth