大量工程实践和试验证明,静压预制管桩施工时的承载力会随时间变化而变化,广泛存在承载力时间效应现象,可以利用现场静压桩机的特点,采用隔时复压试验对管桩承载力变化规律进行预测。正常施工周期下静压工程桩受到建筑物施工影响,桩顶荷载在终压力后逐渐增加,直到工程竣工,受荷状况不同于隔时复压试验桩情况。综合考虑静压桩受荷状况,引入调节系数进行调节,对施工周期下工程桩承载力时间效应进行必要的修正。工程实例证明,正确应用施工周期下静压管桩承载力时间效应,可以对桩基进行优化设计,降低工程成本。
A large number of engineering practice and tests show that the static pressure precast pipe pile bearing capacity will change with time, there is a wide range of bearing capacity of the time effect phenomenon, you can use the characteristics of the site hydrostatic pile machine, Pile bearing capacity variation rule to predict. Under the normal construction period, the static pressure engineering pile is affected by the construction of the building. The pile top load gradually increases after the final pressure until the completion of the project. Taking into consideration the loading condition of hydrostatic piles, the adjustment coefficient is introduced to adjust the time effect of the bearing capacity of the engineering piles under the construction cycle, and the necessary corrections are made. The engineering example proves that the proper application of the time effect of the static pressure pipe pile bearing capacity under the construction period can optimize the design of the pile foundation and reduce the construction cost.