论文部分内容阅读
本文介绍了大坝施工混凝土质量的评价系统软件的设计思路和设计成果。它利用现代计算机技术和应用模糊数学理论评价混凝土重力坝和拱坝单块和整体的质量。在采用模糊综合评价工程质量中,对不同工艺环节,对坝体不同部位,鉴于其质量要求的差异应赋予不同的权重,在权重的取值上采用了专家调查排序,定量转化的方法是比较适宜的。在程序设计中,评价数学模型采用了BASIC程序,该模块通过*TXT文件实现了与整个大坝混凝土质量微机管理系统的接口及数据传递。操作运行方便灵活
This paper introduces the dam design concrete quality evaluation system software design ideas and design results. It uses modern computer technology and the application of fuzzy mathematics to evaluate the monolithic and overall quality of concrete gravity dams and arch dams. In the use of fuzzy comprehensive evaluation of project quality, different processes, different parts of the dam, in view of the differences in quality requirements should be given different weights, the weight of the value of the use of expert survey sort, quantitative conversion method is to compare suitable. In programming, the evaluation mathematical model uses the BASIC program, which realizes the interface and data transmission with the entire dam concrete quality computer management system through * TXT file. Convenient and flexible operation and operation