在分析西宁地区铁路现状及存在问题的基础上,结合西宁—成都线和兰新第二双线的引入与功能定位,以及铁路客货运量预测,提出兰新第二双线引入既有站、新建客运站和客货分线3个铁路总图规划方案,经过方案优缺点分析和工程技术经济比较,推荐采用引入既有客运站,自西宁东站客货分线疏解方案。
Based on the analysis of the status quo and existing problems of railway in Xining region and the introduction and function positioning of Xining - Chengdu Line and Lanxin Second Double Line, as well as the prediction of railway passenger and freight traffic volume, It is recommended to introduce the existing passenger terminal and the solution plan for passenger and cargo sub-lines from the Xining East Station through the analysis of the advantages and disadvantages of the program and the comparison of engineering and technical economics.