据1991年10月号报导,独联体的中央锅炉透平研究所和哈尔科夫汽轮机厂(XT3)联合制订了一种汽轮机装置自动化设计子系统。该系统可用来设计汽轮机装置并分析运行的偏差。计算汽轮机装置热平衡的程序包由下列10个模块组成: 模块1——输入设计所需要的原始资料;
According to the October 1991 report, the CIS Central Boiler and Turbine Research Institute and the Kharkiv Steam Turbine Works (XT3) jointly developed a steam turbine plant automation design subsystem. The system can be used to design turbine installations and analyze run-out deviations. The package that calculates the heat balance of a turbine unit consists of the following 10 modules: Module 1 - Enter the raw data needed for the design;