论文部分内容阅读
水电部成都勘测设计院邀请有关单位于1982年12月14日至19日在成都座谈研究西藏羊卓雍湖水电站水量平衡计算及环境影响,会上通过了会议纪要。参加座谈会的代表们认为,修建羊卓雍湖水电站是有科学根据的,成都勘测院根据现有资料提出的水量平衡计算成果,可以作为设计的依据。羊卓雍湖水电站对环境影响是利多弊少,不利影响是局部的,而且是可以寻求解决办法的。并认为羊卓雍湖水电站完成补充初步设计后,水量平衡及环境影响方面还有许多需要更深入研究的课题,由于这些课题涉及多种
Ministry of Water Resources, Chengdu Survey and Design Institute invited the relevant units in December 14, 1982 to 19 in Chengdu to discuss the Tibetan sheep Zhuo Yhu Lake Hydropower Station water balance calculation and environmental impact, the meeting passed the minutes. The representatives attending the symposium believed that the construction of Yangzhuo Yonevo Lake Hydropower Station is scientifically based and the calculation results of water balance proposed by Chengdu Prospecting Institute based on available data can serve as the basis for design. The Yam Zhuo Yumho Hydropower Station has many advantages and disadvantages to the environment, its adverse impact is partial and it is possible to find a solution. After considering that the preliminary design of the Yakeshuantong Lake Hydropower Station has completed the preliminary design, there are still many issues that need to be studied in more depth in terms of water balance and environmental impact. Since these issues involve a variety of issues